Manufacturer reserves the right to discontinue, or change at any time, specifications or designs without notice and without incurring obligations. Catalog No. 533-080 Printed in U.S.A. Form 39-7SI Rev. A Pg 1 12-2020 Replaces: New

Installation, Start-Up and Service Instructions

CONTENTS Page

SAFETY CONSIDERATIONS . . . . . . . . . . . . . . . . . . . . . . . . . . 1,2 INTRODUCTION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-8 Unit Identification . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .2 PREINSTALLATION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9-12 Rigging . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .9 Suspended Units . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .9 Service Clearance . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .9 Condensate Drain . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .9 External Vibration Isolators. . . . . . . . . . . . . . . . . . . . . . . . . . . . .9 INSTALLATION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 13-35 Base Rail Split . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .13 Mixing Box . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .14 Condensate Drain . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .16 Variable Frequency Drive (VFD) . . . . . . . . . . . . . . . . . . . . . . . .16 Install Fan Motor . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .16 Install Sheaves on Motor and Fan Shafts . . . . . . . . . . . . . .16 Install V-Belts . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .17 Water and Steam Coil Piping Recommendations . . . . . .19 Coil Freeze-Up Protection . . . . . . . . . . . . . . . . . . . . . . . . . . . . .22 Refrigerant Piping, Direct Expansion (DX) Coils . . . . . . .24 Electric Heaters . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .31 Discharge Modification . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .34 START-UP . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 35,36 Check List . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .35 SERVICE . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 36-46 General . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .36 Fan Motor Replacement . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .36 Coil Cleaning . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .36 Winter Shutdown (Chilled Water Coil Only) . . . . . . . . . . . .36 Field-Installed Coils . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .37 Coil Removal . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .37 Changing Coil Hand . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .41 Filters . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .42 Fan Shaft Bearing Removal. . . . . . . . . . . . . . . . . . . . . . . . . . . .43 Fan and Shaft Removal . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .45 Lubrication . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .45 Fan Sled Disassembly . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .46 METRIC CONVERSION CHART . . . . . . . . . . . . . . . . . . . . . . . .47

SAFETY CONSIDERATIONS Air-handling equipment is designed to provide safe and reli-

able service when operated within design specifications. To avoid

injury to personnel and damage to equipment or property when operating this equipment, use good judgment and follow safe practices as outlined below.

DANGER

NEVER enter an enclosed fan cabinet or reach into a unit while the fan is running. LOCK OPEN AND TAG the fan motor power disconnect switch before working on a fan. Take fuses with you and note removal on tag. Electric shock can cause personal injury or death. LOCK OPEN AND TAG the electric heat coil power dis- connect switch before working on or near heaters.

WARNING

CHECK the assembly and component weights to be sure that the rigging equipment can handle them safely. Note also, the centers of gravity and any specific rigging instructions. CHECK for adequate ventilation so that fumes will not migrate through ductwork to occupied spaces when weld- ing or cutting inside air-handling unit cabinet or plenum. WHEN STEAM CLEANING COILS be sure that the area is clear of personnel. DO NOT attempt to handle access covers and removable panels on outdoor units when winds are strong or gusting until you have sufficient help to control them. Make sure panels are properly secured while repairs are being made to a unit. DO NOT remove access panel fasteners until fan is com- pletely stopped. Pressure developed by a moving fan can cause excessive force against the panel which can injure personnel. DO NOT work on dampers until their operators are disconnected. BE SURE that fans are properly grounded before working on them.

39LA,LB,LC,LD,LF,LG,LH03-25 Indoor Air-Handling Units

2

INTRODUCTION

Unit Identification The 39L units are identified by the 18-digit part number listed on the serial plate. The part number de- scribes all component, coil, motor, drive, and control selections. See Fig. 1-9 for unit identification.

WARNING

DO NOT USE TORCH to remove any component. System contains oil and refrigerant under pressure. To remove a component, wear protective gloves and gog- gles and proceed as follows: a. Shut off electrical power to unit. b. Recover refrigerant to relieve all pressure from sys-

tem using both high-pressure and low pressure ports. c. Traces of vapor should be displaced with nitrogen

and the work area should be well ventilated. Refrig- erant in contact with an open flame produces toxic gases.

d. Cut component connection tubing with tubing cutter and remove component from unit. Use a pan to catch any oil that may come out of the lines and as a gage for how much oil to add to the system.

e. Carefully unsweat remaining tubing stubs when nec- essary. Oil can ignite when exposed to torch flame.

Failure to follow these procedures may result in personal injury or death.

CAUTION

DO NOT re-use compressor oil or any oil that has been exposed to the atmosphere. Dispose of oil per local codes and regulations. DO NOT leave refrigerant system open to air any longer than the actual time required to service the equipment. Seal circuits being serviced and charge with dry nitrogen to prevent oil contamination when timely repairs cannot be completed. Failure to follow these proce- dures may result in damage to equipment.

CAUTION

SECURE drive sheaves with a rope or strap before work- ing on a fan to ensure that rotor cannot free-wheel. DO NOT restore power to unit until all temporary walk- ways inside components have been removed. NEVER pressurize equipment in excess of specified test pressures. PROTECT adjacent flammable material when welding or flame cutting. Use sheet metal or asbestos cloth to contain sparks. Have a fire extinguisher at hand and ready for immediate use.

IMPORTANT: The installation of air-handling units and all associated components, parts, and accessories which make up the installation and subsequent maintenance shall be in accordance with the regulations of ALL authorities having jurisdiction and MUST conform to all applicable codes. It is the responsibility of the installing contractor to determine and comply with ALL applicable codes and regulations. Field-supplied motors should be Underwriters Laboratories (UL) or Canadian Standards Association (CSA) approved. Field wiring must comply with National Electrical Code (NEC) and all local requirements.

39LA 39LB 39LC

39LD 39LF

39LG

39LH

HORIZONTAL DRAW-THRU

VERTICAL DRAW-THRU

Fig. 1 Unit Identification

a39-4440

3

39L C 03 HB CA 1

39L 39L Air Handler

Special Order

Draw-Thru Options

Base Unit Coil Description

N/A

Unit Size 03 06 08 10 12 15 18 21 25

Model A

B

C D

F G H

A

Preheat Coil

C

Base Unit Coil Coil Type and Arrangement

AHK

Fan Discharge Motor Frequency Fan Speed Motor HP Type Voltage

-

Insulation/Suspension Package/Hand Side

A

a39-4441

Fig. 2 39L Model Number Nomenclature

28N

28N Coil Model Number

Coil Type A Chilled Water

Coil Orientation S Slant V Vertical

F Full

A S 4

Rows 4 6 8

12

12 16 20 22

26

32

Tubes in Face

24

30

36 38

Q

Circuiting Q Quarter H Half

D Double

Fin Material Fins Per Inch Casing Material A AL 8 GALV. B C AL 14 GALV. G CU 8 ST. STL. H J CU 14 ST. STL.

AL 11 GALV.

CU 11 ST. STL.

A B

Tube Size (Copper) A 0 .016 Std. H-Pin B 0 .025 Std. H-Pin

066

Nominal Length Between Tube Sheets (cm)

166

096

136

066 086

116

X

Non-ferrousX

R

Hand Right Hand Left Hand

R L

Fig. 3 Chilled Water Coil Model Number Nomenclature

a39-4442

4

28N

28N Coil Model Number

Coil Type B Hot Water

Coil Orientation V Vertical

F Full

B V 1

Rows 1 2

16

12 16 20

26

Tubes in Face

30 36

H

Circuiting

H Half Fin Material Fins Per Inch Casing Material A AL 8 GALV. B C AL 14 GALV. G CU 8 ST. STL. H J CU 14 ST. STL.

AL 11 GALV.

CU 11 ST. STL.

A A

Tube Size (Copper) A 0 .016 Std. H-Pin B 0 .025 Std. H-Pin

086

Nominal Length Between Tube Sheets (cm)

166

096

136

066 086

116

X

Non-ferrousX

L

Hand Right Hand Left Hand

R L

Fig. 4 Hot Water Coil Model Number Nomenclature

a39-4443

28N

28N Coil Model Number

Coil Type E Direct Expansion

Coil Orientation

V Vertical

B Face Split Half Circuit

E V 4

Rows 4 6

16

12 16 20

26 Tubes in Face

30

36

H

Circuiting A Face Split Quarter Circuit Fin Material

Fins Per Inch Casing Material A AL 8 GALV. B C AL 14 GALV. G CU 8 ST. STL. H J CU 14 ST. STL.

AL 11 GALV.

CU 11 ST. STL.

A A

Tube Size (Copper) A 0 .016 Std. H-Pin B 0 .025 Std. H-Pin

086

Nominal Length Between Tube Sheets (cm)

166

096

136

066 086

116

Z

Standard (varies with coil)Z

L

Hand Right Hand Left Hand

R L

S Slant

8

22 24

32

38

C Face Split Full Circuit D Double Circuit E Row Split Quarter Circuit

F Row Split Half Circuit

G Row Split Full Circuit

Fig. 5 Direct Expansion Coil Model Number Nomenclature a39-4444

5

28L

28L Coil Model Number

Coil Type Z Steam Distributing Tube (1 in. OD)

Coil Position

Z 2 4

Rows 1

06

04 06 08

10 Tubes in Face

12

F

Circuiting

F Non-Freeze Full Circuit

D 3

Tube Size (Copper) 3 1 in. OD x 0.030 Wall

086

Nominal Length Between Tube Sheets (cm)

166

096

136

066 086

116

--

[ Blank]

2

14

Fin Material Fins Per Inch Casing Material C AL 6 GALV. D E

AL 9 GALV. AL 12 GALV.

--

[ Blank]

9- 445

Fig. 6 Steam Distributing Tube Model Number Nomenclature

a39-4445

39L

28L Drive Package Model Number

Drive Type V Variable Speed

Fan Type

K 2 12

Unit Size Large Face Area (sq. ft.)

10 B A 1250

Position 12 is 0 if rpm is 3 digits

1

Motor Horsepower

Constant SpeedK

Forward Curve without VFD 2 Forward Curve with VFD

03 06 08 10

12 15 18 21

25

01 02 03 04 05 06 07 08 09 10 11 12 13

hp hp 1 hp 1 hp 2 hp 3 hp 5 hp 7 hp 10 hp 15 hp 20 hp 25 hp 30 hp

Motor rpm 60 Hz

1200A B C

1800 3600

50 Hz 1000D

E F

1500 3000

Motor Type

XL (Across-the-Line) Open Drip ProofA

B C

Totally Enclosed, Non-Ventilated Totally Enclosed, Fan-Cooled

D Explosion Proof E Encapsulated (Open Drip Proof Frame)

PW (Part-Wind) Open Drip Proof Totally Enclosed, Non-Ventilated Totally Enclosed, Fan-Cooled Explosion Proof

Encapsulated (Open Drip Proof Frame)

F G H J K

Fan Speed rpm

3

3 Safety Factor

1 Set Belt 1.5 Safety Factor

a46-444

Fig. 7 Drive Package Model Number Nomenclature

a46-4 46

6

P R

E -H

E AT

W AT

E R

O R

P

R E

-H E

AT S

TE A

M

P H

W

LE G

E N

D

F ig

. 8

P o

si ti

o n

4 , U

n it

C o

n fi

g u

ra ti

o n

M o

d el

(C o

m p

o n

en t

S eq

u en

ce A

ls o

S h

o w

n )

C O

M B

.

C om

bi na

tio n

P H

P

re he

at P

O S

.

P os

iti on

F ac

to ry

-in st

al le

d op

tio n

co m

po ne

nt s

7

39LA HORIZONTAL COOLING LARGE FACE AREA

1

A B

PRIMARY COIL/FAN SECTIONS

C

39LB HORIZONTAL COOLING SMALL FACE AREA

2

A B

C

39LC HORIZONTAL COOLING/HEATING SMALL FACE AREA

3

A B

C

39LD VERTICAL COOLING LARGE FACE AREA

4

A B

C

39LF VERTICAL COOLING/HEATING SMALL FACE AREA

5

A B

C

39LG FAN ONLY6

A B

C

39LH VERTICAL HEATING SMALL FACE AREA

A B

C

7

ACCESSORY SECTIONS

MIXING BOX8 10FILTER MIXING BOX9 FLAT FILTER 11 ANGLE FILTER 12 PLENUM

13 HOT WATER OR STEAM

PREHEAT COIL

14 ELECTRIC PREHEAT

COIL

PREHEAT SECTIONS

Fig. 9 Section Details

Fan Configurations

Available Configurations A Upblast Rear Discharge B Upblast Front Discharge

C Top Horizontal Front Discharge

Fan Section Access Hinged Door on Hand Side

NOTE: Item numbers refer to Table 1.

a39-4447

a39-4448

8

Table 1 Section Dimensions and Weights

* Item numbers refer to Fig. 9.

SECTION DIMENSIONS (in.) AND WEIGHTS (lb)

Nominal cfm at 500 fpm 1,500 3,000 4,000 5,000 6,000 7,500 9,000 10,500 12,500

Unit Size 03 06 08 10 12 15 18 21 25

Height (in.) LA, LB, LC, LG 24.3 28.2 32.1 32.1 32.1 40.0 43.9 43.9 43.9

Height (in.) LD, LF, LH 45.5 53.3 61.3 61.3 61.3 76.9 84.8 84.8 100.6

Width (in.) 37.9 45.8 49.7 57.6 65.1 65.1 65.1 77.3 77.3 ITEM NO.* DESCRIPTION AWL (in.)

Weight (lb)

1 39LA 40.9 48.8 56.7 56.7 56.7 72.4 80.3 80.3 76.4 200 280 411 470 540 620 695 740 820

2 39LB 29.1 33.1 37.0 37.0 37.0 44.9 48.8 48.8 56.7 150 210 308 352 405 465 521 555 615

3 39LC 37.0 40.9 44.9 44.9 44.9 52.8 56.7 56.7 64.6 170 238 349 400 459 527 590 629 697

4 39LD 21.3 25.2 29.1 29.1 29.1 37.0 40.9 40.9 48.8 230 322 472 540 621 713 799 851 943

5 39LF 21.3 25.2 29.1 29.1 29.1 37.0 40.9 40.9 48.8 230 322 472 540 621 713 799 851 943

6 39LG 21.3 25.2 29.1 29.1 29.1 37.0 40.9 40.9 48.8 120 168 246 282 324 372 417 444 492

7 39LH 21.3 25.2 29.1 29.1 29.1 37.0 40.9 40.9 48.8 220 308 452 517 594 682 764 814 902

ACCESSORIES

Unit Size 03 06 08 10 12 15 18 21 25

Height (in.) 24.3 28.2 32.1 32.1 32.1 40.0 43.9 43.9 43.9

Width (in.) 37.9 45.8 49.7 57.6 65.1 65.1 65.1 77.3 77.3 ITEM NO.* DESCRIPTION AWL (in.)

Weight (lb)

8 Mixing Box Section 27.6 27.6 27.6 27.6 27.6 27.6 35.4 35.4 35.4 139 164 193 219 226 244 283 272 311

9 Filter Mixing Box 27.6 27.6 27.6 27.6 27.6 27.6 35.4 35.4 35.4 150 173 208 227 245 279 327 340 395

10 Flat Filter Section 7.9 7.9 7.9 7.9 7.9 7.9 7.9 7.9 7.9 37 43 48 50 55 74 75 86 90

11 Angle Filter Section 19.7 19.7 19.7 19.7 19.7 19.7 19.7 19.7 19.7 75 82 97 107 114 134 140 159 185

12 Access Section 19.7 19.7 19.7 19.7 19.7 19.7 19.7 19.7 19.7 48 55 60 64 68 74 77 87 92

13 Preheat (Hot Water or Steam) Section

7.9 7.9 7.9 7.9 7.9 7.9 7.9 7.9 7.9 36 42 43 46 49 52 54 53 57

14 Preheat (Electric) Section 19.7 19.7 19.7 19.7 19.7 19.7 19.7 19.7 19.7 49 56 61 66 72 74 76 87 89

LEGEND AWL Airway Length

NOTE: Unit weights do not include coils and motors.

9

PREINSTALLATION 1. Check items received against packing list. Notify Carrier of

any discrepancy. 2. Refer to Fig. 10 for service area requirements. 3. To transfer unit from truck to storage site, refer to rigging de-

tails in Fig. 11 and section on unit rigging for proper han- dling. See Tables 1 and 2 for section and component weights.

4. Do not stack unit components or accessories during storage. Stacking can cause damage or deformation.

5. If unit is to be stored for more than 2 weeks prior to installa- tion, observe the following precautions: a. Choose a dry storage site that is reasonably level and

sturdy to prevent undue stress or permanent damage to the unit structure or components. Do not store unit on vibrating surface. Damage to stationary bearings can occur. Set unit off ground if in heavy rain area.

b. Remove all fasteners and other small parts from job- site to minimize theft. Tag and store parts in a safe place until needed.

c. Cover entire unit with a tarp or plastic coverall. Extend cover under unit if stored on ground. Secure cover with adequate tiedowns or store indoors. Be sure all coil connections have protective shipping caps.

d. Monthly Remove tarp from unit, enter fan sec- tion through access door or through fan inlet, and rotate fan and motor slowly by hand to redistribute the bearing grease and to prevent bearing corrosion.

Rigging (Fig. 11) All 39L units can be rigged by means of the lifting brackets on bottom of unit.

Units are shipped fully assembled. Do not remove shipping skids or protective covering until unit is ready for final placement. Use slings and spreader bars as applicable to lift unit. Do not lift unit by coil connections or headers.

Do not remove protective caps from coil piping connections until ready to connect piping.

Do not remove protective cover or grease from fan shaft until ready to install sheave.

Lay rigid temporary protection such as plywood walkways in unit to prevent damage to insulation or bottom panel during instal- lation.

Suspended Units Figure 12 shows overhead suspension of unit using optional factory-supplied suspension channels.

Each support channel consists of 2 pieces, the smaller of which fits inside the larger one. This allows the channel to be adjusted to the required length for installation.

Channels are shipped on top of the unit. The 2 sections of each channel are shipped one inside the other, and are held in place during shipping by the panel screws in the top panel.

Hardware required for installation of suspension channels is shipped in a package inside the fan section.

At least 2 suspension channels are shipped with each fan and coil unit. One or more extra channels will be supplied depending on the number of accessories ordered. Be sure to install all the sus- pension channels shipped with a unit. Refer to 39L Isolator Mounting (Suspended Unit) certified drawing for details.

To install suspension channels: 1. Remove panel screws to free suspension channels for instal-

lation. Replace screws in top panel. 2. Adjust channel to required length by sliding one channel sec-

tion inside the other. The channel must extend at least 9 in. but not more than 12 in. beyond the edge of the unit. Set length of channel by installing factory-supplied bolts through the overlapping channel sections.

3. Mount unit to suspension channel using factory-supplied nuts and bolts through 7/16-in. diameter holes in unit lifting bracket.

4. Install field-supplied suspension rods through 9/16-in. diame- ter holes provided at outer edges of channel. Be sure hanger rods are securely fastened in place.

Service Clearance Provide adequate space for unit ser- vice access (fan shaft and coil removal, filter removal, motor ac- cess, damper linkage access, etc.) as shown in Fig. 10.

Condensate Drain To prevent excessive build-up of condensate in drain pan, adequate trap clearance must be provided beneath the unit. See Installation, Condensate Drain section on page 16 for additional details.

External Vibration Isolators Install vibration isola- tors per certified drawings, and in accordance with the job specifi- cations and the instructions of the vibration isolator manufacturer. The coil piping must be isolated or have a flexible connection to avoid coil header damage because of unit motion. A flexible con- nection should be installed at the fan discharge.

Fig. 12 and 13 show isolation location for overhead suspension or floor mounting of unit.

CAUTION

If a fork lift truck is used, lift only from heavy end of skid. Minimum recommended fork length is 48 inches.

10

NOTE: Dimensions are in inches, ( ) are in mm.

DIMENSIONS (ft-in.)

SIZE A B C D

E 39LA 39LB 39LC

03 3-17/8 3-13/4 1-91/4 1- 711/16 0-77/8 1-33/4 2- 39/16

06 3-93/4 3-95/8 2-13/16 1-115/8 0-77/8 1-33/4 2- 39/16

08 4-111/16 4-19/16 2-51/8 2- 39/16 0-77/8 1-33/4 2- 39/16

10 4-99/16 4-97/16 2-51/8 2- 39/16 0-77/8 1-33/4 2- 39/16

12 5-51/16 5-55/16 2-51/8 2- 39/16 0-77/8 1-33/4 2- 39/16

15 5-51/16 5-55/16 3-1 2-119/16 0-77/8 1-33/4 2- 39/16

18 5-51/16 5-55/16 3-415/16 3- 33/8 0-77/8 1-33/4 2-117/16

21 6-51/4 6-51/8 3-415/16 3- 33/8 0-77/8 1-33/4 2-117/16

25 6-51/4 6-51/8 4-015/16 2- 39/16 0-77/8 1-33/4 2-117/16

DIMENSIONS (mm)

SIZE A B C D

E 39LA 39LB 39LC

03 952 959 540 500 200 400 700 06 1162 1159 640 600 200 400 700 08 1262 1259 740 700 200 400 700 10 1462 1459 740 700 200 400 700 12 1653 1659 740 700 200 400 700 15 1653 1659 940 900 200 400 700 18 1653 1659 1040 1000 200 400 900 21 1962 1959 1040 1000 200 400 900 25 1962 1959 1240 700 200 400 900

Fig. 10 Service Area Requirements

11

Table 2 Additional Component Weights

LEGEND

*Coils have 14 aluminum fins per inch on copper tubes.

NOTE: See Table 1 for section weights and dimensions.

UNIT SIZE 03 06 08 10 12 15 18 21 25 TYPICAL DRY COIL WEIGHTS (lb) Large Face Area Cooling Coils, 1/2-in. OD (Chilled Water & DX)* 4-Row 56 84 98 109 137 178 198 251 280 6-Row 63 95 123 138 174 234 270 327 363

Small Face Area Cooling Coils, 1/2-in. OD (Chilled Water & DX)* 4-Row 45 72 91 105 133 161 182 211 238 6-Row 53 85 113 129 162 197 225 270 307 8-Row 61 92 129 143 189 228 263 324 377

Hot Water Coils, 1/2-in. OD* 1-Row 19 34 38 48 58 62 77 86 95 2-Row 28 43 51 61 76 89 104 117 130

Steam Coils, 1-row, 1-in. OD 6-FPI 50 70 85 95 110 135 150 180 215 9-FPI 55 80 100 115 125 155 175 214 256 12-FPI 60 85 115 130 145 180 205 248 297

FAN Wheel Diameter (in.) 91/2 125/8 125/8 15 15 181/8 20 20 25 Wheel Width (in.) 71/8 91/2 111/8 111/8 15 15 131/2 18 15 Shaft Diameter (in.) 3/4 13/16 13/16 13/16 13/16 17/16 17/16 17/16 111/16 Maximum Fan Rpm 2500 2000 2000 1600 1600 1400 1300 1100 1000

OPERATING CHARGE (Approximate), DIRECT EXPANSION COIL Refrigerant R-410A or R-22 (lb)

4-Row Coil 1-2 2-3 3-4 4-5 4-5 5-6 6-7 6-8 6-9 6-Row Coil 1-2 2-4 5-6 5-6 6-8 8-10 9-11 11-13 11-16 8-Row Coil 2-3 3-5 5-6 5-7 7-9 10-12 12-14 13-19 16-24

COIL VOLUME (gal. water) Chilled Water, 1/2-in. OD Tube, Large Face Area 4-Row 2.5 3.5 4.5 5.2 5.6 7.3 8.5 10.4 12.0 6-Row 3.2 4.7 6.0 6.8 7.7 10.1 11.7 14.2 16.3

Chilled Water, 1/2-in. OD Tube, Small Face Area

4-Row 2.1 3.3 3.9 4.1 5.1 6.3 7.3 8.7 9.8 6-Row 2.4 3.7 5.1 5.9 6.6 8.3 9.5 11.8 13.5 8-Row 2.7 4.1 6.4 7.4 8.4 10.7 12.1 14.7 17.2

Hot Water, 1/2-in. OD Tube 1-Row 0.5 0.8 1.0 1.3 1.5 1.8 2.1 2.5 2.9 2-Row 0.7 1.3 1.6 2.0 2.4 2.9 3.4 4.0 4.8

COOLING COILS Chilled Water 1/2-in. OD Tube, (4, 6 Row) Large Face Area

Face Area (sq ft) 3.63 5.90 7.90 9.54 11.18 14.91 17.71 21.6 25.0 Number of Tubes/Face 16 20 24 24 24 32 38 38 44 Finned Tube Length (in.) 26.1 34.0 37.9 45.8 53.7 53.7 53.7 65.5 65.5

Chilled Water 1/2-in. OD Tube (4, 6, 8 Row) Small Face Area Face Area (sq ft) 2.72 4.72 6.58 7.95 9.32 12.12 13.98 17.1 20.5 Number of Tubes/Face 12 16 20 20 20 26 30 30 36 Finned Tube Length (in.) 26.1 34.0 37.9 45.8 53.7 53.7 53.7 65.5 65.5

DX 1/2-in. OD Tube (4, 6 Row) Large Face Area

Face Area (sq ft) 3.63 5.90 7.90 9.54 11.18 14.91 17.71 21.6 25.0 Finned Tube Length (in.) 26.1 34.0 37.9 45.8 53.7 53.7 53.7 65.5 65.5

DX 1/2-in. OD Tube (4, 6, 8 Row) Small Face Area Face Area (sq ft) 2.72 4.72 6.58 7.95 9.32 12.12 13.98 17.1 20.5 Finned Tube Length (in.) 26.1 34.0 37.9 45.8 53.7 53.7 53.7 65.5 65.5

HEATING COILS Hot Water 1/2-in. OD Tube, U-Bend (1, 2 Row) Face Area (sq ft) 2.72 4.72 6.58 7.95 9.32 12.12 13.98 17.1 20.5 Number Tubes/Face 12 16 20 20 20 26 30 30 36 Finned Tube Length (in.) 26.1 34.0 37.9 45.8 53.7 53.7 53.7 65.5 65.5

Steam 1-in. OD (1 Row) Face Area (sq ft) 2.13 4.18 6.22 7.53 8.85 11.06 13.28 16.2 18.9 Number Tubes/Face 4 6 8 8 8 10 12 12 14 Finned Tube Length (in.) 25.5 33.4 37.3 45.2 53.1 53.1 53.1 53.1 64.9

DX Direct Expansion FPI Fins Per Inch

12

SPREADER BAR

LIFTING BRACKET

Fig. 11 Unit Rigging Details

NOTE: Lift in one piece. Use slings and spreader bars at each lifting bracket.

a39-4449

LIFTING BRACKET DETAILS

7 16/ IN. DIAM. HOLE

VIBRATION ISOLATORS (FIELD SUPPLIED)

SUSPENSION ROD (FIELD SUPPLIED)

SUSPENSION CHANNEL (FACTORY-SUPPLIED OPTION)

MOUNT UNIT TO SUSPENSION CHANNELS THROUGH PROVIDED IN LIFTING BRACKET

7 16/ IN. DIAM. HOLES

FACTORY-SUPPLIED BOLTS

CONNECTING SUSPENSION CHANNEL SECTIONS

OVERHEAD SUSPENSION a3 - 450

Fig. 12 Unit Support Details, Overhead Suspension

a39-4450

SPRING ISOLATOR

ISOLATION BRACKET

7 16/ IN. DIAM. HOLE

ISOLATION DETAIL FLOOR MOUNT

Fig. 13 Unit Support Details, Floor Mount

a38-4451

13

INSTALLATION

Base Rail Split A base rail split between the primary coil/ fan section and the accessory sections is optional. If this option has ben selected, the 39L unit will arrive at the job site assembled as one piece. The split allows the unit to be separated at the joint. If the unit must be separated in the field, follow this procedure: 1. Remove the lifting lugs on the inlet side of the coil/fan sec-

tion and those on the outlet side of the accessory section to liberate the T-bracket. See Fig 14.

2. Unscrew the flanges (top and sides) around the coil/fan sec- tion and the accessory section. See Fig. 15.

NOTE: If the section-to-section gasket installed at the factory is damaged while splitting the unit, obtain the required length of 1/8 in. x 1 1/4 in. foam gasketing locally.

After rejoining the split sections, fully tighten all AB 1/4 in.-3/4 in. screws on the flanges and the AB 1/4 in-5/8 in. screws on the flanges. See Fig. 16.

CAUTION

Ensure that a good seal is created between both sections before continuing. A poor seal may result in equipment dam- age.

T-BRACKET

LIFTING LUG

a3 4 53

Fig. 14 Base Rail Split T-Bracket

9- 4

FLANGES

FLANGES

Fig. 15 Base Rail Split Flanges

a39-4454

AB - 5 8/ SCREWS

AB - SCREWS

Fig. 16 Base Rail Split Screws

a39-4455

14

Mixing Box DAMPER ACTUATORS The 39L mixing boxes are supplied with low leak dampers and blade and edge seals. Damper operat- ing torques are shown in Table 3.

The actuator and mounting brackets are field supplied and may be mounted inside or outside the unit. A typical inside mounting bracket is shown in Fig. 17. For external mounting of actuators, drill or punch a hole in the exterior panel. NOTE: If the unit is shipped with AirManager controls, actua- tor(s) are factory-supplied. Refer to Table 4.

To ensure torque is transmitted equally to both damper sec- tions, actuator must be connected to the 1-in. hollow jackshaft that drives the interconnecting linkage bar. Connection to any other shaft is not recommended. DUCTWORK ATTACHMENT Ductwork should be flanged out and attached to the mixing box panels as shown in Fig. 18. See Fig. 19 for duct connection sizes.

Table 3 Mixing Box Damper Operating Torque (in.-lb)

NOTES: 1. Torque values are based on interconnected dampers driven by one

operator. For units with separate operators for each damper, calcu- late torque as follows: Table values x .80 = torque per damper sec- tion.

2. Damper shaft moves 90 degrees from open to closed position.

39L UNIT SIZE TORQUE 03 20 06 20 08 26 10 29 12 33 15 41 18 52 21 56 25 76

MXB Mixing Box

Fig. 18 Mixing Box Ductwork Attachment

Fig. 17 Typical Mixing Box Actuator Mounting

15

Table 4 Recommended Actuators

*Actuator is spring-return type. NOTES:

1. All actuators are direct coupled type, designed to be directly mounted into jackshaft assembly.

2. All actuators are equipped with a plenum rated cable, factory-ter- minated to the actuator. Part No. HF27BB035 and 034 are 16 ft, HF27BB033 is 9.5 ft.

3. Damper areas are nominal and based on low leakage type damp- ers.

4. For larger damper assemblies, multiple activators may be used. 5. Part No. HF27BB033 and 034 are designed for inlet guide vane

and face and bypass applications, but may be used for external relief dampers if spring return is not required.

ACCESSORY PACKAGE

NO.

ACTUATOR PART NO.

VOLTAGE (50/60 Hz) VA

ROUND SHAFT SIZE

MIN-MAX (in.)

TIMING (sec)

DAMPER AREA (sq ft) TORQUE

(in.-lb)

MAXIMUM STROKE (degrees)

MAXIMUM WIRE

LENGTH (ft)Parallel Opposed

33AMACTDMP133 HF27BJ035* 24 10 0.750-1.050 150 44 53 133 90 300 33AMACTGV-133 HF27BJ033 24 4 0.375-0.625 < 150 N/A N/A 133 90 725 33AMACTGV-266 HF27BJ034 24 6 0.475-0.750 135 N/A N/A 266 90 450

DIMENSIONS (ft-in.)

Fig. 19 Mixing Box Duct Connections

UNIT 39L- A B C D E F G H J K L

03 2- 39/16 3-17/8 2-01/4 1- 5 1-5 0- 15/8 0-61/16 0-101/2 1-43/4 1-51/4 1- 51/4 06 2- 39/16 3-93/4 2-43/16 1-11 1-5 0- 41/8 0-61/16 0-113/8 1-811/16 2-11/4 1- 71/4 08 2- 39/16 4-111/16 2-81/8 3- 1 1-5 0- 61/16 0-61/16 0- 63/8 2-05/8 3-31/4 1- 71/4 10 2- 39/16 4-99/16 2-81/8 3- 5 1-5 0- 61/16 0-61/16 0- 85/16 2-05/8 3-71/4 1- 71/4 12 2- 39/16 5-57/16 2-81/8 3-11 1-5 0- 61/16 0-61/16 0- 91/4 2-05/8 4-11/4 1- 71/4 15 2- 39/16 5-57/16 3-4 3-11 1-9 0- 8 0-41/16 0- 91/4 2-81/2 4-11/4 1-111/4 18 2-117/16 5-57/16 3-715/16 3-11 2-3 0- 7 0-5 0- 91/4 3-07/16 4-11/4 2- 51/4 21 2-117/16 6-51/4 3-715/16 3-11 2-5 0- 6 0-4 1- 31/8 3-07/16 4-11/4 2- 71/4 25 2-117/16 6-51/4 4-313/16 5- 4 2-5 0- 97/8 0-4 0- 65/8 3-85/16 5-61/4 2- 71/4

NOTES: 1. Hand is determined by the location of the fan drive and/or coil connection when viewed

while facing the direction toward which air is flowing. 2. Dimensions are in inches, ( ) are in millimeters.

16

Condensate Drain Install a trapped condensate drain line at unit drain connection. Use 1-in. standard pipe.

Measure maximum design negative static pressure up- stream from the fan. Referring to Fig. 20, height H must be equal to or larger than negative static pressure at design operat- ing conditions. Prime enough water in trap to prevent losing seal (Differential 1). When the fan starts, Differential 2 is equal to the maximum negative static pressure.

Provide freeze-up protection and insulation as required.

Variable Frequency Drive (VFD) Variable fre- quency drives (VFDs) are used to modulate fan motor speed in response to air volume requirements. To vary the motor speed, a VFD changes the input frequency and line voltage into a wide range of frequency and voltage outputs, while maintain- ing a constant ratio of frequency to voltage.

Since 2001, all 1-hp and greater motors supplied by Carrier for the 39L series air handling units are designed and construct- ed for use with variable frequency drives. If a field-supplied motor is installed, ensure the motor is suitable for use with a VFD.

If the lead length from the VFD to the motor is greater than 25 ft, Shaft Grounding Rings (SGR) are necessary to help dis- sipate induced shaft voltages to ground and prevent motor bearing damage.

Install Fan Motor For field installation of motors, be sure electrical junction box is toward the center of the unit. This is necessary for drive and belts to be properly tightened. Use smallest slots in motor mounting base that will accommo- date motor and allow minimum overhang (Fig. 21). Be sure that motor holddown bolts are tight on field-installed motor. JUNCTION BOX CONDENSATE PREVENTION

When air handlers are installed outdoors in a high humidity environment or indoors where the apparatus room is used as a fresh air plenum, precautions must be taken to prevent conden- sation from forming inside the junction box of the internally mounted motor.

Standard installation practice is to mount the motor starter or fused disconnect box adjacent to the air handler and enclose the power wiring to the motor in flexible conduit.

The sheet metal housing of the disconnect switch or motor starter is not airtight (even when a box meeting NEMA [National Electrical Manufacturers Association] IV standards is used). Thus, warm moist air can migrate through the flexible conduit to the junction box on the motor. With the motor located inside the unit, the motor temperature is that of the cool

supply air; thus, condensate can form inside the junction box and, possibly, on the live terminal lugs.

To prevent the moist air from migrating through the conduit to the motor, seal the power wires inside the flexible conduit at the motor starter or fused disconnect.

Use a nonconductive, nonhardening sealant. Permagum (manufactured by Schnee Morehead) or sealing compound, thumb grade (manufactured by Calgon), are acceptable materials. POWER KNOCKOUTS Panels are not provided with knockouts for the fan motor power wiring. Openings must be drilled or punched in the exterior panels of the unit. It is recom- mended that power wiring be routed through the discharge panel whenever possible, as this panel is rarely removed for service access.

Install Sheaves on Motor and Fan Shafts Factory-supplied drives are prealigned and tensioned, however, Carrier recommends that you check the belt tension and align- ment before starting the unit. Always check the drive align- ment after adjusting belt tension.

When field installing or replacing sheaves, install sheaves on fan shaft and motor shaft for minimum overhang. (See Fig. 21.) Use care when mounting sheave on fan shaft; too much force may damage bearing. Remove rust-preventative coating or oil from shaft. Make sure shaft is clean and free of burrs. Add grease or lubricant to bore of sheave before installing.

The 39L fan, shaft, and drive pulley are balanced as a com- plete assembly to a high degree of accuracy. If excessive unit vibration is present after fan pulley replacement, the unit must be rebalanced. For drive ratio changes, always reselect the mo- tor pulley do not change the fan pulley.

ALIGNMENT Make sure that fan shafts and motor shafts are parallel and level. The most common causes of mis- alignment are nonparallel shafts and improperly located sheaves. Where shafts are not parallel, belts on one side are drawn tighter and pull more than their share of the load. As a result, these belts wear out faster, requiring the entire set to be replaced before it has given maximum service. If misalignment is in the sheave, belts will enter and leave the grooves at an angle, causing excessive belt cover and sheave wear. 1. Shaft alignment can be checked by measuring the

distance between the shafts at 3 or more locations. If the distances are equal, then the shafts will be parallel.

2. Sheave alignment: Fixed sheaves To check the location of the fixed sheaves on the shafts, a straightedge or a piece of string can be used. If the sheaves are properly lined up the string will touch them at the points indicated by the arrows in Fig. 22. Adjustable sheave To check the location of adjustable sheave on shaft, make sure that the centerlines of both sheaves are in line and parallel with the bearing support channel. See Fig. 22. Adjustable pitch drives are installed on the motor shaft.

3. Rotating each sheave a half revolution will determine whether the sheave is wobbly or the drive shaft is bent. Correct any misalignment.

FAN OFF

TRAP CONDITION WHEN FAN STARTS

FAN RUNNING AND CONDENSATE DRAINING

DIFFERENTIAL 1

DRAIN NIPPLE

DIFFERENTIAL 2

COOLING COIL DRAIN PAN

H

Fig. 20 Condensate Drain

CAUTION

With adjustable sheave, do not exceed maximum fan rpm.

17

4. With sheaves aligned, tighten cap screws evenly and pro- gressively. NOTE: There should be a 1/8-in. to 1/4-in. gap between the mating part hub and the bushing flange. If gap is closed, the bushing is probably the wrong size.

5. With taper-lock bushed hubs, be sure the bushing bolts are tightened evenly to prevent side-to-side pulley wobble. Check by rotating sheaves and rechecking sheave alignment. When substituting field-supplied sheaves for factory-sup- plied sheaves, consider that the fan shaft sheave has been factory balanced with fan and shaft as an assembly. For this

reason, substitution of motor sheave is preferable for final speed adjustment.

Install V-Belts When installing or replacing belts, always use a complete set of new belts. Mixing old and new belts will re- sult in the premature wear or breakage of the newer belts.

Refer to label on inside of fan access door for information on factory-supplied drive. 1. Always adjust the motor position so that V-belts can be in-

stalled without stretching over grooves. Forcing belts can re- sult in uneven stretching and a mismatched set of belts.

2. Do not allow belt to bottom out in sheave. 3. Tighten belts by turning motor-adjusting jackscrews. Turn

each jackscrew an equal number of turns. 4. Equalize belt slack so that it is on the same side of belt for all

belts. Failure to do so may result in uneven belt stretching. 5. Tension new drives at the maximum deflection force recom-

mended (Table 5). On current production, the correct tension information is list- ed on the fan drive label. For older equipment or units with field-modified drives, use the deflection formula in the fol- lowing example and the tension data from Table 5. EXAMPLE: Given

Belt Span 16 in. Belt Cross-Section A, Super Belt Small Sheave PD 5 in.

Solution a. From Table 5 find that deflection force for a new type

A, super belt with 5-in. small sheave PD is 8 lb. b.

Tension Measurement Procedure 1. Measure the belt span (see Fig. 23). 2. Position bottom of the large O-ring on the span scale at the

measured belt span.

Fig. 21 Determining Sheave-Shaft Overhang

Fig. 22 Sheave Alignment Deflection = (Belt Span)

64

Deflection = 16 64

18

3. Set the small O-ring on the deflection force scale to zero. 4. Place the tension checker squarely on one belt at the cen-

ter of the belt span. Apply a force on the plunger and per- pendicular to the belt span until the bottom of the large O- ring is even with the top of the adjacent (next) belt or with the bottom of a straight edge laid across the outside diam- eters of the v-belt sheaves.

5. Remove the tension checker and read the force applied from the bottom of the small O-ring on the deflection force scale.

6. Compare the force you have applied with the values giv- en in Table 5. The force should be between the Used Belt and New Belt values shown. The maximum val- ue is shown for New Belt and new belts should be ten- sioned at this value to allow for expected tension loss. New Belt tensions should be used at initial installation

and after job start or 1 to 3 minutes of operation. Used belts should be maintained at the value as indicated in the chart. Used Belt tensions should be used for the 8-hour and subsequent checks. If the belt span was measured in centimeters, then use the kilograms of force values for comparison.

NOTE: The ratio of deflection to belt span is 1:64 in either unit of measurement.

Whenever possible, jog start for a few revolutions or prefer- ably run drive for approximately 1 to 3 minutes and then re- tension in accordance with Steps 1-6. Running the drive for a few revolutions or minutes will help seat the belt(s) in the groove(s). This relatively early re-tensioning may reduce or minimize the amount of re-tensioning required in the first 24 hours of drive service. Record information on the label (Fig. 24) found on the door of the fan section.

Table 5 Fan Belt Tension Data

SHEAVE DIAMETER (in.) DEFLECTION FORCE (lb)

BELT STYLE SMALLEST

SHEAVE DIAMETER RANGE

RPM RANGE

BELT DEFLECTION FORCE SUPER GRIPBELTS AND UNNOTCHED

GRIPBANDS GRIPNOTCH BELTS AND NOTCHED

GRIPBANDS USED BELT NEW BELT USED BELT NEW BELT

A, AX

3.0 - 3.6 1000-2500 2501-4000

3.7 2.8

5.5 4.2

4.1 3.4

6.1 5.0

3.8 - 4.8 1000-2500 2501-4000

4.5 3.8

6.8 5.7

5.0 4.3

7.4 6.4

5.0 - 7.0 1000-2500 2501-4000

5.4 4.7

8.0 7.0

5.7 5.1

8.4 7.6

B, BX

3.4 - 4.2 860-2500 2501-4000

4.9 4.2

7.2 6.2

4.4 - 5.6 860-2500 2501-4000

5.3 4.5

7.9 6.7

7.1 6.1

10.5 9.1

5.8 - 8.6 860-2500 2501-4000

6.3 6.0

9.4 8.9

8.5 7.3

12.6 10.9

C, CX 7.0 - 9.0 500-1740

1741-3000 11.5 9.4

17.0 13.8

14.7 11.9

21.8 17.5

9.5 - 16.0 500-1740 1741-3000

14.1 12.5

21.0 18.5

15.9 14.6

23.5 21.6

D 12.0 - 16.0 200-850

851-1500 24.9 21.2

37.0 31.3

18.0 - 20.0 200-850 851-1500

30.4 25.6

45.2 38.0

3V, 3VX

2.2 - 2.4 1000-2500 2501-4000

3.3 2.9

4.9 4.3

2.65 - 3.65 1000-2500 2501-4000

3.6 3.0

5.1 4.4

4.2 3.8

6.2 5.6

4.12 - 6.90 1000-2500 2501-4000

4.9 4.4

7.3 6.6

5.3 4.9

7.9 7.3

5V, 5VX

4.4 - 6.7 500-1749 1750-3000 3001-4000

10.2 8.8 5.6

15.2 13.2 8.5

7.1 - 10.9 500-1749 1750-3000 3001-4000

12.7 11.2

18.9 16.7

14.8 13.7

22.1 20.1

11.8 - 16.0 500-1749 1750-3000 3001-4000

15.5 14.6

23.4 21.8

17.1 16.8

25.5 25.0

8V 12.5 - 17.0 200-850

851-1500 33.0 26.8

49.3 39.9

18.0 - 22.4 200-850 851-1500

39.6 35.3

59.2 52.7

19

Water and Steam Coil Piping Recommendations GENERAL Use straps around the coil casing or the lifting holes (see Fig. 25) to lift and place the coil.

Piping practices are outlined in the Carrier System Design Man- ual, Part 3, Piping Design. See Tables 6-7 for circuiting data. WATER COILS Typically, coils are piped by connecting the supply at the bottom and the return at the top. See Fig. 25. This is not always the case, especially if the coil hand has been changed in the field. Coils must be piped for counterflow; otherwise, a ca- pacity reduction of 5% for each coil row will result. To ensure counterflow, chilled water coils are piped so that the coldest water meets the coldest air. Hot water coils are piped so that the warmest water meets the warmest air. STEAM COILS Position the steam supply connection at the top of the coil, and the return (condensate) connection at the bot- tom. The coil tubes must incline downwards toward the return header connection for condensate drainage. See Fig. 26-30 and Table 8.

Figure 26 illustrates the normal piping components and the suggested locations for high, medium, or low-pressure steam coils. The low-pressure application (zero to 15 psig) can dispense with the -in. petcock for continuous venting located above the vacuum breaker (check valve).

50 10

0 15

0 S

PA N

IN C

H E

S 15

20 25

30

50 10

0 15

0 S

PA N

IN C

H E

S 0

5 10

15 20

25 30

5 0

10 0

1 50

S P

AN IN

C H

ES 0

5 10

15 20

2 5

30

DEFLECTION FORCE

(LB.)

SMALL O RING

SPAN SCALE

STRAIGHT EDGE

LARGE O RING

V-BELT ADJACENT V-BELT

BELT SPAN

Fig. 23 Fan Belt Tension

Fig. 24 Fan Section Label

NOTICE TENSION BELTS TO SPECIFICATION

SHOWN ON DRIVE LABEL. OVER TENSIONING BELTS WILL SEVERELY REDUCE BELT AND BEARING LIFE.

REPLACEMENT PARTS

BEARINGS

DRIVE ________________________

FREE _________________________

SHAFT _________________________

WHEEL _________________________

INLET CONE ____________________

TO ORDER REPLACEMENT PARTS, CONTACT: RCD

(REPLACEMENT COMPONENTS DIVISION) 1-800-443-4410

CAUTION

To prevent damage to the coil or coil headers: Do not use the headers to lift the coil. Support the piping and coil connections independently. Do not use the coil connections to support pip- ing. When tightening coil connections, use a backup wrench on the nozzles.

20

Note the horizontal location of the 15-degree check valve, and the orientation of the gate/pivot. This valve is intended to relieve any vacuum forming in the condensate outlet of a condensing steam coil, and to seal this port when steam pressure is again sup- plied to the coil. It must not be installed in any other position, and should not be used in the supply line.

For coils used in tempering service, or to preheat outside air, in- stall an immersion thermostat in the condensate line ahead of the trap. This will shut down the supply fan and close the outdoor damper whenever the condensate falls to a predetermined point, perhaps 120 F. NOTE: Do NOT use an immersion thermostat to override a duct thermostat and open the steam supply valve.

For vacuum return systems, the vacuum breaking check valve would be piped into the condensate line between the trap and the gate valve instead of open to the atmosphere.

Figure 27 illustrates the typical piping at the end of every steam supply main. Omitting this causes many field problems and failed coils.

Figure 28 shows the typical field piping of multiple coils. Use this only if the coils are the same size and have the same pressure drop. If this is not the case, an individual trap must be provided for each coil.

Figure 29 shows a multiple coil arrangement applied to a grav- ity return, including the open air relief to the atmosphere, which DOES NOT replace the vacuum breakers.

Figure 30 illustrates the basic condensate lift piping. Following the piping diagrams in Fig. 26-30, make all connec-

tions while observing the following precautions: Install a drip line and trap on the pressure side of the inlet

control valve. Connect the drip line to the return line down- stream of the return line trap.

To prevent scale or foreign matter from entering the control valve and coil, install a 3/32-in. mesh strainer in the steam supply line upstream from the control valve.

Provide air vents for the coils to eliminate noncondensable gases.

Select a control valve according to the steam load, not the coils supply connection size. Do not use an oversized con- trol valve.

Do not use bushings that reduce the size of the header return connection. The return connection should be the same size as the return line and reduced only at the down- stream trap.

To lift condensate above the coil return line into overhead steam mains, or pressurized mains, install a pump and receiver between the condensate trap and the pressurized main. Do not try to lift condensate with modulating or on- and-off steam control valves. Use only 15-degree check valves, as they open with a lower water head. Do not use 45-degree or vertical-lift check valves.

Use float and thermostatic traps. Select the trap size accord- ing to the pressure difference between the steam supply main and the return main.

Load variations can be caused by uneven inlet air distribu- tion or temperature stratification.

Drain condensate out of coils completely at the end of the heating season to prevent the formation of acid.

Table 6 Hot Water Coil Circuiting Data

LEGEND

NOTE: All hot water coils have 11/2-in. MPT.

Fig. 25 Coil Connections and Lifting Points

39L UNIT SIZE 03 06 08 10 12 15 18 21 25 No. of Circuits

1-ROW H 6 8 10 10 10 13 15 15 13

2-ROW H F

6 8 10 10 10 13 15 15 13 12 16 20 20 20 26 30 30 36

F Full Circuit H Half Circuit

21

Table 7 Chilled Water Coil Circuiting Data

LEGEND NOTES: 1. Connection sizes are MPT inches. 2. Sizes 21-25 have 2 coils.

Table 7 Chilled Water Coil Circuiting Data (cont)

LEGEND *Not available on 39LB units. NOTE: Connection sizes are MPT - inches.

LARGE FACE AREA (39LA, 39LD)

COIL TYPE CIRCUIT

UNIT SIZE 03 06 08 10 12

Face Area (sq ft) 3.63 5.90 7.90 9.54 11.18

No. Circuits

Connection Size

No. Circuits

Connection Size

No. Circuits

Connection Size

No. Circuits

Connection Size

No. Circuits

Connection Size

4-ROW Q 4 11/2 5 11/2 H 8 11/2 10 11/2 12 11/2 12 11/2 12 11/2 F 16 11/2 20 11/2 24 21/2 24 21/2 24 21/2 D

6-ROW H 8 11/2 10 11/2 12 11/2 12 11/2 12 11/2 F 16 11/2 20 11/2 24 21/2 24 21/2 24 21/2 D 36 21/2 36 21/2 36 21/2

LARGE FACE AREA (39LA, 39LD)

COIL TYPE CIRCUIT

UNIT SIZE 15 18 21 25

Face Area (sq ft) 14.91 17.71 21.60 25.00

No. Circuits

Connection Size

No. Circuits

Connection Size

No. Circuits

Connection Size

No. Circuits

Connection Size

4-ROW Q H 16 11/2 19 11/2 19 11/2 22 11/2 F 32 21/2 38 21/2 38 21/2 44 21/2 D 76 21/2 88 21/2

6-ROW H 16 11/2 19 11/2 19 11/2 F 32 21/2 38 21/2 38 21/2 44 21/2 D 48 21/2 57 21/2 57 21/2 66 21/2

D Double Circuit F Full Circuit H Half Circuit Q Quarter Circuit

SMALL FACE AREA (39LB, 39LC, 39LF)

COIL TYPE CIRCUITING

UNIT SIZE 03 06 08 10 12

Face Area (sq ft) 2.72 4.72 6.58 7.95 9.23

No. Circuits

Connection Size

No. Circuits

Connection Size

No. Circuits

Connection Size

No. Circuits

Connection Size

No. Circuits

Connection Size

4-ROW

Q 3 11/2 4 11/2 H 6 11/2 8 11/2 10 11/2 10 11/2 10 11/2 F 12 11/2 16 11/2 20 21/2 20 21/2 20 21/2 D

6-ROW H 6 11/2 8 11/2 10 11/2 10 11/2 10 11/2 F 12 11/2 16 11/2 20 21/2 20 21/2 20 21/2 D 30 21/2 30 21/2 30 21/2

8-ROW* H 6 11/2 8 11/2 10 11/2 10 11/2 10 11/2 F 12 11/2 16 11/2 20 21/2 20 21/2 20 21/2 D 40 21/2 40 21/2 40 21/2

SMALL FACE AREA (39LB, 39LC, 39LF)

COIL TYPE CIRCUITING

UNIT SIZE 15 18 21 25

Face Area (sq ft) 12.12 13.98 17.10 20.50

No. Circuits

Connection Size

No. Circuits

Connection Size

No. Circuits

Connection Size

No. Circuits

Connection Size

4-ROW

Q H 13 11/2 15 11/2 15 11/2 18 11/2 F 26 21/2 30 21/2 30 21/2 36 21/2 D 60 21/2 72 21/2

6-ROW H 13 11/2 15 11/2 15 11/2 11/2 F 26 21/2 30 21/2 30 21/2 36 21/2 D 39 21/2 45 21/2 45 21/2 54 21/2

8-ROW* H 13 11/2 13 11/2 11/2 11/2 F 26 21/2 30 21/2 30 21/2 36 21/2 D 52 21/2 60 21/2 60 21/2 72 21/2

D Double Circuit F Full Circuit H Half Circuit Q Quarter Circuit

22

Table 8 Steam Coil Connection Sizes

LEGEND

NOTE: Connection sizes are MPT - inches.

Coil Freeze-Up Protection WATER COILS If a chilled water coil is applied with out- side air, provisions must be made to prevent coil freeze-up. Install a coil freeze-up thermostat to shut down the system if any air temperature below 36 F is encountered entering the water coil. Follow thermostat manufacturers instructions.

When a water coil is applied downstream of a direct- expansion (DX) coil, a freeze-up thermostat must be installed between the DX and water coil and electrically interlocked to turn off the cooling to prevent freeze-up of the water coil.

For outdoor-air application where intermittent chilled water coil operation is possible, one of the following steps should be taken: Install an auxiliary blower heater in cabinet to maintain

above-freezing temperature around coil while unit is shut down.

Drain coils and fill with an ethylene glycol solution suit- able for the expected cold weather operation. Shut down the system and drain coils. See Service section, Winter Shutdown, page 36.

STEAM COILS When used for preheating outdoor air in pressure or vacuum systems, an immersion thermostat to con- trol outdoor-air damper and fan motor is recommended. This control is actuated when steam supply fails or condensate tem- perature drops below an established level, such as 120 to 150 F. A vacuum breaker should also be used to equalize coil pressure with the atmosphere when steam supply throttles close. Steam should not be modulated when outdoor air is below 40 F.

On low-pressure and vacuum steam-heating systems, the thermostat may be replaced by a condensate drain with a ther- mal element. This element opens and drains the coil when con- densate temperature drops below 165 F. Note that condensate drains are limited to 5 psig pressure. INNER DISTRIBUTING TUBE STEAM COILS The inner distributing tube (IDT) steam coil used in the Carrier 39L air-handling units has an inner tube pierced to facilitate the dis- tribution of the steam along the tubes length. The outer tubes are expanded into plate fins. The completed assembly includes the supply and condensate header and side casings which are built to slant the fin/tube bundle back toward the condensate header. The slanting of the assembly ensures that condensate will flow toward the drains. This condensate must be removed through the return piping to prevent premature failure of the coil. The fin/tube bundle is slanted vertically for horizontal air- flow coils, and horizontally for vertical air-flow coils. IDT Steam Coil Piping The following piping guidelines will contribute to efficient coil operation and long coil life: 1. Use full size coil outlets and return piping to the steam

trap. Do not bush return outlet to the coil. Run full size to the trap, reduce at the trap.

2. Use float and thermostatic traps only for condensate re- moval. Trap size selection should be based on the differ- ence in pressure between the steam supply main and the

condensate return main. It is good practice to select a trap with 3 times the condensate rating of the coil to which it is connected.

3. Use thermostatic traps for venting only. 4. Use only 1/2-in., 15-degree swing check valves installed

horizontally, piped open to atmosphere, and located at least 12 in. above the condensate outlet. Do not use 45-degree, vertical lift and ring check valves.

5. The supply valve must be sized for the maximum antici- pated steam load.

6. Do not drip steam mains into coil sections. Drip them on the pressure side of the control valve and trap them into the return main beyond the trap for the coil.

7. Do not use a single trap for two or more coils installed in series. Where two or more coils are installed in a single bank, in parallel, the use of a single trap is permissible, but only if the load on each coil is equal. Where loads in the same coil bank vary, best practice is to use a separate trap for each coil. Variation in load on different coils in the same bank may be caused by several factors. Two of the most common are uneven airflow distribution across the coil and stratifi- cation of inlet air across the coil.

8. Do not try to lift condensate above the coil return into an overhead main, or drain into a main under pressure with a modulating or on/off steam control valves. A pump and receiver should be installed between the coil conden- sate traps and overhead mains and return mains under pressure.

9. Use a strainer (3/32-in. mesh) on the steam supply side, as shown in the piping diagrams, to avoid collection of scale or other foreign matter in the inner tube distributing orifices.

NOTE: IDT coils must be installed with the tubes draining toward the header end of the coil. Carrier's IDT steam coils are pitched toward the header end as installed in the unit. 10. Ensure the AHU (air-handling unit) is installed level to

maintain the inherent slope. Also ensure the unit is in- stalled high enough to allow the piping to be installed cor- rectly, especially the traps which require long drip legs.

11. Do not fail to provide all coils with the proper air vents to eliminate noncondensable gasses.

12. Do not support steam piping from the coil units. Both mains and coil sections should be supported separately.

IDT Steam Coil Installation Refer to drawings to position the coils properly with regard to the location of the supply and return connections. Ensure that the IDT coil is pitched with the tubes draining toward the header. Carriers AHUs provide proper coil pitch when the AHU is installed level.

Refer to schematic piping diagrams and piping connection notes for the recommended piping methods.

39L UNIT SIZE FACE AREA COIL TYPE CIRCUITING CONNECTION CONNECTION SIZE

03-25 Small 1-Row F Inlet 21/2

Outlet 11/2

F Full Circuit

23

27

NOTES: 1. Flange or union is located to facilitate coil removal. 2. Flash trap may be used if pressure differential between steam

and condensate return exceeds 5 psi. 3. When a bypass with control is required. 4. Dirt leg may be replaced with a strainer. If so, tee on drop can

be replaced by a reducing ell. 5. The petcock is not necessary with a bucket trap or any trap

which has provision for passing air. The great majority of high or medium pressure returns end in hot wells or deaerators which vent the air.

Fig. 26 Low, Medium or High Pressure Coil Piping

NOTES: 1. A bypass is necessary around trap and valves when continu-

ous operation is necessary. 2. Bypass to be the same size as trap orifice but never less than

1/2 inch.

Fig. 27 Dripping Steam Supply to Condensate Return

NOTES: 1. Flange or union is located to facilitate coil removal. 2. When a bypass with control is required. 3. Flash trap can be used if pressure differential between supply

and condensate return exceeds 5 psi. 4. Coils with different pressure drops require individual traps. This

is often caused by varying air velocities across the coil bank. 5. Dirt leg may be replaced with a strainer. If so, tee on drop can

be replaced by a reducing ell. 6. The petcock is not necessary with a bucket trap or any trap

which has provision for passing air. The great majority of high pressure return mains terminate in hot wells or deaerators which vent the air.

Fig. 28 Multiple Coil High Pressure Piping

27

24

Refrigerant Piping, Direct-Expansion (DX) Coils (Fig. 31) Direct-expansion coils are divided into 2 or 4 splits depending upon the unit size and coil circuiting. See Table 9 for coil circuiting data. Each split requires its own distributor nozzle, expansion valve, and suction piping. Suction connections are on the air entering side when the coil is properly installed. Matching distributor connections for each coil split are on the air leaving side. See unit label or certified drawing to assure connection to matching suction and liquid connections. See Table 10 for distrib- utor part numbers.

27

NOTES: 1. Flange or union is located to facilitate coil removal. 2. When control valve is omitted on multiple coils in parallel air

flow. 3. When a bypass with control is required. 4. Coils with different pressure drops require individual traps.

This is often caused by varying air velocities across the coil bank.

Fig. 29 Multiple Coil Low Pressure Piping Gravity Return

NOTES: 1. Flange or union is located to facilitate coil removal. 2. To prevent water hammer, drain coil before admitting steam. 3. Do not exceed one foot of lift between trap discharge and

return main for each pound of pressure differential. 4. Do not use this arrangement for units handling outside air.

Fig. 30 Condensate Lift to Overhead Return

CAUTION

Direct-expansion coils are shipped pressurized with dry air. Release pressure from each coil split through valves in protec- tive caps before removing caps. Do not leave piping open to the atmosphere unnecessarily. Water and water vapor are detrimental to the refrigerant sys- tem. Until the piping is complete, recap the system and charge with nitrogen at the end of each workday. Clean all piping connections before soldering joints. The lower split of face split coils should be first on, last off. Row split coils utilize special intertwined circuits (as shown in Fig. 31); either split of these row split coils can be first on, last off.

Fig. 31 Typical Direct-Expansion Row Split Coil

25

SUCTION PIPING Connect suction piping as shown in Fig. 32 for face split coil or Fig. 33 for row split coil.

Suction line from coil connection to end of the 15-diameter- long riser should be same tube size as coil connection to ensure proper refrigerant velocity.

Refer to Carrier System Design Manual, Part 3, and size re- maining suction line to compressor for a pressure drop equivalent to 2.0 F. This will provide a total suction line header pressure drop equivalent to approximately 2.5 F. Refer to Fig. 34 for piping ris- ers to the compressor.

To minimize the possibility of flooded starts and compressor damage during prolonged light load operation, install an accumu- lator in the suction line or a solenoid in the liquid line of last-on, first off split in row-split applications. EXPANSION VALVE PIPING Distributor nozzles sized for acceptable performance for a range of conditions are factory sup- plied. Use the AHU (Air-Handling Unit) selection program in the Carrier electronic catalog to select optimal nozzle sizes. Replace factory nozzle as necessary for best performance. See Fig. 35.

Thermostatic expansion valves are field supplied. See Fig. 35. NOTE: Be sure that correct nozzle is installed in each distributor before installing expansion valve. Before installing field-supplied nozzles, remove nozzle retainer rings and factory-installed mini- mum-sized nozzles from distributors. Install expansion valve (Fig. 35) as follows: 1. Wrap wet cloths around valve body to prevent excessive heat

from reaching diaphragm and internal parts. Do not allow water to enter system. Disassemble expansion valve before soldering, if accessible, for easy reassembly. Use 95-5 tin- antimony soft solder.

2. Solder expansion valve outlet directly to distributor unless: a. An adapter bushing or coupling is supplied by the fac-

tory (solder adapter to distributor first, then to expan- sion valve).

b. Hot gas bypass is required. (See Hot Gas Bypass sec- tion, below.)

3. Solder expansion valve equalizer line to suction line and lo- cate control bulb on suction line as in Fig. 32 or 33.

4. Insulate expansion valve body, diaphragm assembly and control bulb area to prevent charge migration and excessive condensation.

5. Install filter drier ahead of expansion valve to ensure satis- factory valve operation.

HOT GAS BYPASS When low-load operation requires use of hot gas bypass, hot gas must be introduced between expansion valve and distributor. See Table 11.

Install hot gas bypass connector (Fig. 36 and 37) in coil split that is first on, last off as follows: 1. Remove distributor nozzle and retainer ring (area A) from

distributor and reinstall in inlet (area B) of side connector. 2. Solder side connector outlet to distributor inlet, using silver

solder or equivalent with 1300 to 1500 F melt temperature. 3. Silver-solder expansion valve outlet to side connector inlet. 4. If required, install factory-supplied adapter bushing or cou-

pling to connector inlet before soldering to expansion valve outlet.

TXV Thermostatic Expansion Valve

Fig. 32 Face Split Coil Suction Line Piping

TXV Thermostatic Expansion Valve

Fig. 33 Row Split Coil Suction Line Piping

Fig. 34 Suction Line Riser Piping

26

Table 9 Direct Expansion Coil Circuiting Data

LEGEND

* Where each TXV has the same number of circuits, that number is shown once. When coil has an uneven number of circuits per TXV, both values are shown.

Factory-supplied distributors have factory-selected nozzle sizes shown. If necessary, replace factory-supplied nozzles with field-sup- plied and installed nozzles. Consult Electronic Catalog AHU selection program for correct nozzle selection.

**May be field manifolded for either face split or row split.

LARGE FACE AREA (39LA, 39LD) UNIT SIZE 03 06 08 10 12

CIRCUITING TYPE Qtr Half Full Qtr Half Full Qtr Half Full Qtr Half Full Half Full CFM AT 550 FPM 1996 3245 4345 5247 6149 FACE AREA (sq ft) 3.63 5.90 7.90 9.54 11.18 TUBE FACE 16 20 24 24 24 TUBE LENGTH (in.) 26.1 34.0 37.9 45.8 53.7 NUMBER OF CIRCUITS 4 8 16 10 20 12 24 12 24 12 24

NUMBER OF TXVs 2 2 2 2 2 2 2 2 2 2 2 NUMBER OF CIRCUITS/TXV* 2 4 8 5 10 6 12 6 12 6 12 SUCTION CONNECTIONS

(in. OD) 7/8 11/8 13/8 11/8 13/8 11/8 15/8 11/8 15/8 11/8 15/8

DISTRIBUTOR CONNECTIONS (in. OD)

7/8 7/8 11/8 7/8 11/8 7/8 15/8 7/8 15/8 7/8 11/8

4-ROW COIL Circuit Equivalent Length (ft) 52 26 32 34 18 40 20 45 23 Distributor Tube Length (in.)

Face Split 11 11 11 13 15 13 15 13 15 Row Split 13 15 16 18 18 18 18 18 18

Distributor Nozzle Size 2 2 3 4 4 5 5 6 6 6-ROW COIL

Circuit Equivalent Length (ft) 39 20 47 24 51 26 59 30 67 34 Distributor Tube Length (in.)

Face Split 11 11 11 13 13 15 13 15 13 15 Row Split 15 16 16 18 18 21 18 21 18 21

Distributor Nozzle Size 2 3 3 3 4 4 5 5 6 6

LARGE FACE AREA (39LA, 39LD) UNIT SIZE 15 18 21 25

CIRCUITING TYPE Half Full Half Full Half Full Half Full Double CFM AT 550 FPM 8200 9740 11,880 13,750 FACE AREA (sq ft) 14.91 17.71 21.6 25.0 TUBE FACE 32 38 38 22U-22L TUBE LENGTH (in.) 53.7 53.7 65.5 65.5 NUMBER OF CIRCUITS 16 32 19 38 19 38 22 44 88

U L U L U L NUMBER OF TXVs 2 4** 2 4** 2 4** 2 2 2 2 4 4 NUMBER OF CIRCUITS/TXV* 8 8 9-10 9-10 9-10 9-10 5-6 5-6 11 11 11 11 SUCTION CONNECTIONS

(in. OD) 11/8 13/8 13/8 13/8 13/8 11/8 11/8 11/8 15/8 15/8 15/8 15/8 DISTRIBUTOR CONNECTIONS

(in. OD) 11/8 11/8 11/8 11/8 11/8 11/8 7/8 7/8 13/8 13/8 13/8 13/8

4-ROW COIL Circuit Equivalent Length (ft) 45 23 45 23 54 26 54 54 26 26 Distributor Tube Length (in.)

Face Split 15 16 16 16 16 163/4 12 12 15 15 Row Split 26 16 28 16 28 163/4 21 21 23 23

Distributor Nozzle Size 8 4 10 5 10 5 8 8 5 5 6-ROW COIL

Circuit Equivalent Length (ft) 67 34 67 34 81 40 40 40 Distributor Tube Length (in.)

Face Split 15 16 16 18 16 181/2 15 15 Row Split 23 16 28 18 28 181/2 22 22

Distributor Nozzle Size 8 4 10 5 10 5 5 5

AHU Air-Handling Unit Selection Program TXV Thermostatic Expansion Valve (Field-supplied)

27

Table 9 Direct Expansion Coil Circuiting Data (cont)

LEGEND

*Where each TXV has the same number of circuits, that number is shown once. When coil has an uneven number of circuits per TXV, both values are shown.

Factory-supplied distributors have factory-selected nozzle sizes shown. If necessary, replace factory-supplied nozzles with field-sup- plied and installed nozzles. Consult Electronic Catalog AHU selection program for correct nozzle selection.

**Not available on 39LB units. May be field manifolded for either face split or row split.

SMALL FACE AREA (39LB, 39LC, 39LF) UNIT SIZE 03 06 08 10 12

CIRCUITING TYPE Qtr Half Full Qtr Half Full Qtr Half Full Qtr Half Full Half Full CFM AT 550 FPM 1496 2596 3619 4372 5126 FACE AREA (sq ft) 2.72 4.72 6.58 7.95 9.32 TUBE FACE 12 16 20 20 20 TUBE LENGTH (in.) 26.1 34.0 37.9 45.8 53.7 NUMBER OF CIRCUITS 4 6 4 8 16 10 20 10 20 10 20 NUMBER OF TXVs 2 2 2 2 2 2 2 2 2 2 2 NUMBER OF CIRCUITS/TXV* 2 3 2 4 8 5 10 5 10 5 10 SUCTION CONNECTIONS

(in. OD) 7/8 11/8 7/8 11/8 13/8 11/8 13/8 11/8 13/8 11/8 13/8

DISTRIBUTOR CONNECTIONS (in. OD)

7/8 7/8 7/8 7/8 11/8 7/8 7/8 7/8 7/8 7/8 7/8

4-ROW COIL Circuit Equivalent Length (ft) 52 26 62 32 34 18 40 20 45 23 Distributor Tube Length (in.)

Face Split 11 11 11 11 11 18 11 18 11 18 Row Split 11 11 11 15 16 18 16 18 16 18

Distributor Nozzle Size 11/2 11/2 21/2 21/2 4 4 5 5 5 5 6-ROW COIL

Circuit Equivalent Length (ft) 58 39 47 24 51 26 59 30 67 34 Distributor Tube Length (in.)

Face Split 111/2 111/2 111/2 111/2 111/2 13 111/2 13 111/2 13 Row Split 111/2 13 15 16 16 181/2 16 181/2 16 181/2

Distributor Nozzle Size 11/2 11/2 21/2 3 4 4 5 5 5 5 8-ROW COIL**

Circuit Equivalent Length (ft) 52 63 32 68 34 78 39 89 45 Distributor Tube Length (in.)

Face Split 111/2 111/2 111/2 111/2 13 111/2 13 111/2 13 Row Split 13 15 16 16 181/2 16 181/2 16 181/2

Distributor Nozzle Size 11/2 21/2 3 4 4 5 5 5 5

SMALL FACE AREA (39LB, 39LC, 39LF) UNIT SIZE 15 18 21 25

CIRCUITING TYPE Half Full Half Full Half Full Half Full Double CFM AT 550 FPM 6666 7689 9405 11,275 FACE AREA (sq ft) 12.12 13.98 17.1 20.5 TUBE FACE 26 30 30 36 TUBE LENGTH (in.) 53.7 53.7 65.5 65.5 NUMBER OF CIRCUITS 16 26 15 30 15 30 18 36 72 NUMBER OF TXVs 2 4 2 4 2 4 2 4 4 NUMBER OF CIRCUITS/TXV* 6-7 6-7 7-8 7-8 7-8 7-8 9 9 18 SUCTION CONNECTIONS

(in. OD) 13/8 13/8 13/8 13/8 13/8 13/8 13/8 13/8 15/8 DISTRIBUTOR CONNECTIONS

(in. OD) 7/8 7/8 7/8-11/8 7/8-11/8 7/8-11/8 7/8-11/8 11/8 11/8 13/8

4-ROW COIL Circuit Equivalent Length (ft) 45 23 45 23 54 26 54 26 Distributor Tube Length (in.)

Face Split 13 16 13 16 13/15 16 16 15 Row Split 21 16 23 16 231/2 16 26 15

Distributor Nozzle Size 6 3 8 4 8 4 8 4 6-ROW COIL

Circuit Equivalent Length (ft) 67 34 67 34 81 40 40 Distributor Tube Length (in.)

Face Split 13 16 13 16 13/15 16 163/4 Row Split 21 16 231/2 16 231/2 16 163/4

Distributor Nozzle Size 6 3 8 4 8 4 4 8-ROW COIL

Circuit Equivalent Length (ft) 89 45 89 45 54 54 26 Distributor Tube Length (in.)

Face Split 13 16 15 16 16 163/4 16 Row Split 21 16 231/2 16 16 163/4 16

Distributor Nozzle Size 6 3 8 4 4 4 8

AHU Air-Handling Unit Selection Program TXV Thermostatic Expansion Valve (Field-supplied)

28

Table 10 Distributor Part Numbers

Table 11 Side Connector (Hot Gas Bypass) Data

PART NO. NO. OF

TUBES

CONNECTION OD (in.)

SPORLAN NOZZLE

Sporlan Carrier Type Size 1112-2-1/4 EA07NC261 2

0.88 G 3/4 to 12

1112-3-1/4 EA07FC027 3 1112-4-1/4 EA07NC262 4 1112-5-1/4 EA07NC263 5 1112-6-1/4 EA07NC264 6 1113-7-1/4 EA07HC207 7 1113-8-1/4 EA07HC208 8 1115-8-1/4 EA07KC240 8

1.12 E 3 to 301115-9-1/4 EA07KC241 9 1115-10-1/4 EA07KC242 10 1116-11-1/4 EA07HC011 11 1117-11-1/4 EA07LC510 11

1.38 C 3 to 50

1117-12-1/4 EA07HC012 12 1117-13-1/4 EA07HC013 13 1126-14-1/4 EA07TC290 14 1126-15-1/4 EA07HC015 15 1126-16-1/4 EA07TC207 16 1126-17-1/4 EA07HC017 17

Fig. 35 Expansion Valve Piping

Fig. 36 Distributor and Hot Gas Bypass Auxiliary Side Connector

SPORLAN TYPE

CARRIER PART NO.

CONNECTION SIZES (in.) USED WITH DISTRIBUTOR TYPE

NOZZLE SIZEInlet ODM Solder Outlet ODF Solder Auxiliary ODF Solder

ASC-5-4 5/8 5/8 1/2 1620, 1622 J ASC-7-4 EA19BA504 7/8 7/8 1/2 1112, 1113 G ASC-9-5 EA19BA705 11/8 11/8 5/8 1115, 1116 E ASC-11-7 EA19BA905 13/8 13/8 7/8 1117, 1126 C ASC-13-9 15/8 15/8 11/8 1125, 1127, 1143 A

DIMENSIONS (in.)

LEGEND

SPORLAN TYPE A B C D E F

ASC-5-4 5/8 ODM 5/8 ODF 1.88 0.95 1.25 1/2 ODM ASC-7-4 7/8 ODM 7/8 ODF 2.25 1.06 1.38 1/2 ODM ASC-9-5 11/8 ODM 11/8 ODF 2.81 1.47 1.62 15/8 ODM ASC-11-7 13/8 ODM 13/8 ODF 3.53 1.89 2.19 17/8 ODM ASC-13-9 15/8 ODM 15/8 ODF 3.72 1.83 2.75 11/8 ODM

ODF Outside Diameter, Female ODM Outside Diameter, Male

Fig. 37 Side Connector (Hot Gas Bypass) Dimensions

29

UNLOADING CONSIDERATIONS Direct expansion coils can have two intertwined refrigerant circuits. In addition, quarter, half, full and double circuiting configurations are offered to allow optimum system performance and oil return at full and part-load operation.

Circuiting selection should result in a circuit loading of 0.8 to 2.0 tons per circuit at design load. Circuit loading must be evaluat- ed at minimum load to ensure that it does not drop below 0.6 tons per circuit. Solenoid valves may be used, if necessary, to shut off the refrigerant supply to individual expansion valves to maintain adequate coil circuit loading.

Compressor minimum unloading and TXV quantity is neces- sary to determine minimum tonnage per circuit.

Minimum Unloading Equation:

Example: Condensing Unit: 38ARS012 Minimum Unloading:33% Coil: 6 row, 11 FPI, Half Circuit Coil Tons/Circuit: 1.68 Total TXVs: 2

In the first example we will determine the tons/circuit when both TXVs are active and the compressor is unloaded to its mini- mum of 33%.

= .55 tons/circuit at minimum unloading UNACCEPTABLE If we install a liquid line solenoid valve before one of the

TXVs and close it so that only one TXV is active when the com- pressor is unloaded to its minimum of 33%, we see the follow- ing:

= 1.10 tons/circuit at minimum unloading ACCEPTABLE

SPECIAL PIPING WITH 4 SPLITS PER COIL Manifolding for 2-Face Splits Refer to Fig. 38 and externally manifold as follows: 1. Connect the 4 expansion valves to the 4 distributors on each

coil and connect the 4 suction lines to the 15-diameter-long risers as outlined in previous piping instructions.

2. Install common liquid line for upper face split to first (upper) and second expansion valves. Also, install a common suc- tion line from suction lines attached to first (upper) and sec- ond suction header connections.

3. Repeat Step 2 for lower face split using third and fourth dis- tributor and suction connections.

Manifolding for 2-Row Splits Refer to Fig. 39 and externally manifold as outlined for the 2-face splits with the following exceptions: 1. Manifold in pairs, the first and third coil connections for one

split. 2. Manifold the second and fourth pairs of coil connections for

the other split. NOTE: Split section using first and third pairs of coil connections should be first on, last off for coils with right hand (facing direc- tion of airflow) connections and the reverse for left hand connec- tions. Hot Gas Bypass Connection with 4 Splits per Coil For ei- ther face or row splits connect a hot gas bypass auxiliary side con- nector to each distributor of coil split that is first on, last off. Refer to installation instructions for Hot Gas Bypass.

(Tons/Circuit) x (Minimum Unloading) x (Total # of TXVs) # of TXVs Active

= (1.68 Tons/Circuit) x (33% Minimum Unloading)

x (2 TXVs) 2 TXVs Active

= (1.68) x (.33) x (2) 2

= (1.68 Tons/Circuit) x (33% Minimum Unloading)

x (2 TXVs) 1 TXV Active

= (1.68) x (.33) x (2) 1

30

TXV Thermostatic Expansion Valve

Fig. 38 Face Split Coil Manifolding (Typical)

TXV Thermostatic Expansion Valve

Fig. 39 Row Split Coil Manifolding (Typical)

31

Electric Heaters Electric heaters may be factory installed or drop shipped to the jobsite and field installed. The heater can only be installed in the preheat-electric section.

To install electric heater, refer to Fig. 40 and proceed as follows: 1. Locate preheat-electric section already mounted on unit and

remove protective shipping cover. 2. Locate crate containing electric heater and verify heater

matches the unit. Unit hand and heater hands must agree. 3. Remove both knockout slugs (power and signal). Install con-

duit connectors in top of coil connection box. 4. Remove top panel of the preheat-electric section and drill or

punch 2 holes are specified in Fig. 40. 5. Insert the electric heater into unit. It must slide between 2 an-

gles located on the bottom of the section. 6. Secure heater to the preheat-electric section using 4 screws. 7. Locate top panel of section. Run conduit through top panel

and tighten conduit connectors. Lower top panel and replace panel on unit.

8. Complete wiring per wiring diagram and job requirements. Follow all applicable local codes.

CONNECT POWER AND CONTROL WIRES Heater wiring schematic is located on control box panel. (Figure 41 shows typical wiring details.) Electrical data for each standard heater arrangement is shown in Table 12. Verify that minimum airflow requirement (minimum coil face velocity, fpm) will be met, especially on appli- cations where variable air volume is supplied.

Use copper power supply wires rated for 75 C minimum. On 250-v or greater applications, use 600-v rated wiring. Size wires to carry 125% of current load on each set of terminals (Table 12). Use the following formulas as required: Single-phase line current

Three-phase line current

(kW per set of terminals) (1000) = (voltage) (1.73) Note that if the heater is rated at 50 kW (or more) and is con- trolled by a cycling device such as a multi-stage thermostat, or a step controller, conductors may be sized at 100% of load amperes (as in Tables 12 and 13) per National Electrical Code (NEC) Sec- tion 424-22. Heater construction and application information (Tables 12 and 13) are based upon Underwriters Laboratories (UL) Space Heating Standard No. 1096 and the requirements of the NEC. Installer is responsible for observing local code requirements.

Install a disconnect switch or main circuit breaker in accor- dance with NEC and other applicable codes. Locate so that it is easily accessible and within sight of heater control box (per NEC Article 424-19 and 424-65).

Weatherproof junction boxes have no knockouts for wire en- trance. Drill or punch holes for conduit as required and make all junctions watertight.

Where field-supplied thermostats are used, isolate circuits to prevent possible interconnection of control circuit wiring.

Where field-supplied step controller is used, connect steps to terminals as marked on wiring schematic. When connecting multi- stage heaters, wire stage no. 1 so that it is first stage on, last stage off. Connect thermostats as required.

Provide sufficient clearance for convection cooling of heaters with solid-state controllers. Provide at least 5-in. of free air space above and below cooling fins extending from heater terminal box. Be sure to connect interlock terminals F1 and F2 to auxiliary con- tacts on fan starter.

Each heater has 2 different types of factory-installed thermal cutouts for overtemperature protection; an automatic reset thermal cutout for primary protection and a manual reset thermal cutout to protect against failure of the primary system. Also provided is an airflow pressure differential switch to prevent the heater from op- erating when the fan is not in operation or airflow is restricted or insufficient. The primary automatic reset cutout is a bi-metal disk- type cutout. It is wired into the control circuit which operates the magnetic disconnecting contactors (the same contactors which also switch on and off the various steps of the coil). The secondary manual reset cutout is a bi-metal disk-type cut-out. This secondary thermal cutout is load carrying and is installed in each heater sub- circuit. The primary and secondary overtemperature protection systems are independent of each other. The secondary system is designed to protect against possible failure of the primary system to deenergize the heater.

Subcircuits in the heaters are designed in compliance with paragraph 424-22 of the NEC. The coil is subdivided into circuits that draw no more than 48 amps each and is fused for at least 125% of the circuit rating.

Pitot tube is to be positioned so that the airflow switch is actu- ated by a minimum negative pressure of 0.07 in. wg.

= 1 (kW per set of terminals) (1000)

voltage

= (kW per set of terminals) (1000)

(voltage) (1.73)

Fig. 40 Electric Heater Installation

32

NOTE: All wiring must be copper and must conform to the NEC (National Electrical Code).

Fig. 41 Typical Electric Heater Wiring Schematic

33

Table 12 Electric Heater Data

LEGEND

*Standard control steps are listed under the Control Step heading. Free additional steps of control are optionally available when the number of subcircuits exceeds the standard num- ber of control steps.

MCA = 1.25 x FLA; for proper wire sizing, refer to Table 310-16 of the NEC. **2 control steps in this voltage.

3 control steps in this voltage. ***4 control steps in this voltage.

5 control steps in this voltage. NOTES:

1. Subcircuits are internal heater circuits of 48 amps or less. 2. Electric heat performance is not within the scope of ARI standard 430 certification. 3. To avoid damage due to overheating, minimum face velocity cannot fall below 350 fpm.

UNIT SIZE 39L

HEATER AREA (sq ft)

NO. OF CONTROL

STEPS*

HEATER COIL kW

NOMINAL COIL FACE VELOCITY

(fpm)

TEMP RISE (F)

208/3/60 VOLTS 240/3/60 VOLTS 480/3/60 VOLTS 380/3/50 VOLTS

Total FLA MCA

No. Sub- Ckt

MOCP Total FLA MCA

No. Sub- Ckt

MOCP Total FLA MCA

No. Sub- Ckt

MOCP Total FLA MCA

No. Sub- Ckt

MOCP

03 2.2 3 9 500 26 25 31 1 35 22 27 1 30 11 14 1 20 14 17 1 20

15 500 44 42 52 1 60 36 45 1 50 18 23 1 25 23 29 1 30 17.2 500 50 48 60 1 60 41 52 1 60 21 26 1 30 26 33 1 35

06 3.7 6

8 500 14 22 28 1 30 19 24 1 25 10 12 1 20 12 15 1 20 10 500 17 28 35 1 35 24 30 1 35 12 15 1 20 15 19 1 20 17 500 29 47 59 1 60 41 51 1 60 20 26 1 30 26 32 1 35

19.9 500 34 55 69 2 70 48 60 1 60 24 30 1 30 30 38 1 40 27 500 47 75 94 2 100 65 81 2 90 33 41 1 45 41 51 1 60

29.8 500 51 83 104 2 110 72 90 2 90 36 45 1** 45 45 57 1 60 36 500 62 100 125 3 150 87 108 2 110 43 54 1** 60 55 68 2** 70

08 5.1 6

15 500 19 42 52 1 60 36 45 1 50 18 23 1 25 23 29 1 30 25 500 31 69 87 2 90 60 75 2 80 30 38 1 40 38 48 1 50 35 500 44 97 122 3 125 84 105 2 110 42 53 1 60 53 67 2 70

39.9 500 50 111 139 3 150 96 120 3 125 48 60 2 70 61 76 2 80 43.2 500 54 120 150 3 175 104 130 3 150 52 65 2 70 66 82 2 90 51 500 64 142 177 3 200 123 154 3 175 61 77 2 80 78 97 2 100

10 6.2 6

15 500 15 42 52 1 60 36 45 1 50 18 23 1 25 23 29 1 30 25 500 26 69 87 2 90 60 75 2 80 30 38 1 40 38 48 1 50

39.9 500 41 111 139 3 150 96 120 3 125 48 60 2 70 61 76 2 80 47.3 500 49 131 164 3 175 114 142 3 150 57 71 2 80 72 90 2 90 51.8 500 53 144 180 3 200 125 156 3 175 62 78 2 80 79 98 2 100 59.8 500 62 72 90 2 100 91 114 2 125

12 7.3 6

19.9 500 17 55 69 2 70 48 60 1 60 24 30 1 30 30 38 1 40 29.8 500 26 83 104 2 110 72 90 2 90 36 45 1 45 45 57 1 60 39.9 500 35 111 139 3 150 96 120 3 125 48 60 2 70 61 76 2 80 43 500 38 119 149 3 150 104 129 3 150 52 65 2 70 65 82 2 90

51.8 500 45 144 180 3 200 125 156 3 175 62 78 2 80 79 98 2 100 72 500 63 87 108 2 110 110 137 3 150

15 10.0 6

19.9 500 13 55 69 2 70 48 60 1 60 24 30 1 30 30 38 1 40 29.8 500 19 83 104 2 110 72 90 2 90 36 45 1 45 45 57 1 60 39.9 500 25 111 139 3 150 96 120 3 125 48 60 2 70 61 76 2 80 45 500 29 125 156 3 175 108 135 3 150 54 68 2 70 68 86 2 90

51.8 500 33 144 180 3 200 125 156 3 175 62 78 2 80 79 98 2 100 65 500 42 78 98 2 100 99 124 3 125 86 500 55 104 129 3 150 131 164 3 175

18 11.74 6

19.9 500 11 55 69 2 70 48 60 1 60 24 30 1 30 30 38 1 40 25.8 500 14 72 90 2 90 62 78 2 80 31 39 1 40 39 49 1 50 35 500 19 97 122 3 125 84 105 2 110 42 53 1 60 53 67 2 70 45 500 25 125 156 3 175 108 135 3 150 54 68 2 70 68 86 2 90

51.8 500 28 144 180 3 200 125 156 3 175 62 78 2 80 79 98 2 100 78 500 43 94 117 2 125 119 148 3 150 94 500 51 113 141 3 150 143 179 3 200

21 14.21 6

19.9 500 9 55 69 2 70 48 60 1 60 24 30 1 30 30 38 1 40 25.8 500 12 72 90 2 90 62 78 2 80 31 39 1 40 39 49 1 50 35 500 16 97 122 3 125 84 105 2 110 42 53 1 60 53 67 2 70 45 500 20 125 156 3 175 108 135 3 150 54 68 2 70 68 86 2 90

51.8 500 23 144 180 3 200 125 156 3 175 62 78 2 80 79 98 2 100 79.8 500 36 96 120 3 125 121 152 3 175 92 500 41 111 138 3 150 140 175 3 175

116 500 52 140 175 3 175

25 17.79 6

30 500 11 83 104 2 110 72 90 2 100 36 45 1 50 46 57 1 60 39.9 500 14 111 139 3 150 96 120 3 125 48 60 2 70 61 76 2 80 50 500 18 139 174 3 175 120 151 3 175 60 75 2 80 76 95 2 100 65 500 23 181 226 4 250 157 196 4 200 78 98 2 100 99 124 3 125

79.8 500 29 222 277 5 300 192 240 5 250 96 120 3 125 121 152 3 175 96.5 500 35 268 335 6 350 232 291 5 300 116 145 3 150 147 183 4*** 200 110 500 39 265 331 6 350 132 166 3 175 167 209 4*** 225 145 500 52 175 218 4*** 225 221 276 5 300

ARI Air Conditioning and Refrigeration Institute AWG American Wire Gage FLA Full Load Amps kW Kilowatts MCA Minimum Circuit Amps MOCP Maximum Overcurrent Protection

34

Table 13 Field Wiring for Incoming Conductors Sized for 125% of Heater Load

LEGEND

*Values are based on Table 310-16 of the NEC (National Electrical Code) for 75 C insulated copper wire. Not more than 3 conductors in a raceway.

NOTES: 1. Be sure to consider length of wiring run and possible voltage drops

when sizing wires. 2. Field power wiring Heaters are furnished with a terminal block

sized for incoming copper conductors with 75 C insulation rated to carry at least 125% of the heater load. However, conductors can be sized to carry 100% of the heater load if the heater is rated at 50 kW or more, and the heater is controlled by a cycling device such as a multi-stage thermostat, step controller, or SCR (silicon control rectifier) power controller. Terminal blocks and knockouts are sized to handle either 100% or 125% conductors.

Discharge Modification If field modification of dis- charge position is required, 39L fans can be converted (by a skilled mechanic) to any standard hand and discharge without any

additional parts. (NOTE: This does not apply to a model change conversion.) All mounting holes are prepunched.

To convert a 39L fan, note the following: 1. Sizes 03-18 w See Fig. 42. It is not necessary to remove

the bearing support channels from the fan housing. Sizes 21 and 25 See Fig. 43. The A frame support must be removed. To change from upblast to horizontal discharge or from horizontal to upblast discharge, the bearings must be relocated to keep the wheel centered in the housing. To change from upblast front (UBF) to upblast rear (UBR) or from top horizontal front (THF) to top horizontal rear (THR) or vice versa, turn the entire fan housing 180 degrees about its base.

2. The fan shaft may be driven out and reinstalled to place the drive pulley on the opposite end.

3. The fan scroll is prepunched for horizontal or vertical dis- charge to match the support angles at the base of the unit.

4. The motor and motor base may be rotated to place the motor at the front or rear of the unit. Proper location is that which results in the longest drive center line distance. The motor conduit box location may need to be reversed.

5. When hand of fan is changed, it may be necessary to turn the discharge panel inside-out to fit correctly with the fan dis- charge. In this case, remove the existing insulation and in- stall new duct-liner type insulation on the opposite side of the discharge panel.

6. Rebalancing of the unit is recommended.

WIRE SIZE (AWG or kcmil)

LOAD AMPS* WIRE SIZE (AWG or kcmil)

LOAD AMPS* Copper Copper

12 16 1/0 120 10 24 2/0 140 8 40 3/0 160 6 52 4/0 184 4 68 250 204 3 80 300 228 2 92 350 248 1 104 400 268

500 304

AWG American Wire Gage kcmil Thousand Circular Mils

Fig. 42 Fan Discharge Positions, Sizes 03-18

LEGEND THF Top Horizontal Front THR Top Horizontal Rear UBF Upblast Front UBR Upblast Rear

35

START-UP

Check List Make a walkway inside unit components to protect insulation. Remove all construction debris from unit inte- rior. Remove walkway before starting unit. FILTERS Install unit filters in all filter sections. FANS 1. Check lubrication of fan, motor bearings, and linkages.

a. Note that bearings are shipped completely full of grease for corrosion protection and may run warm temporarily on start-up until excess grease has dis- charged.

b. Hand-operate all linkages, such as damper and guide vanes, to check for freedom of movement.

2. Check tightness of bearing setscrews or locking collars (Fig. 44). Also, check tightness of setscrews on fan wheels and sheaves.

3. Check tightness of fan shaft bearing mounting. 4. Recheck sheave alignment and belt tension. (Refer to Fig. 22

and 23.) 5. Hand turn fan to make certain fan wheel does not rub in

housing.

UBF UBR THR

THF

Fig. 43 Fan Discharge Positions, Sizes 21 and 25

LEGEND THF Top Horizontal Front THR Top Horizontal Rear UBF Upblast Front UBR Upblast Rear

SQUEEZE-TYPE LOCKING COLLAR BEARING SETSCREW TORQUE (in.-lb)

BEARING HOLDDOWN BOLT TORGQUE (ft-lb)

Fig. 44 Fan Shaft Bearing Details

39L UNIT SIZE TORQUE 03,06,08,10,12 70

15,18,21,25 90

BOLT SIZE TORQUE 3/8-16 30 1/2-13 63 5/8-11 100

36

6. Check fan speed with a strobe-type tachometer or use the following formula: Obtain the motor rpm from the fan motor nameplate and read sheave pitch diameters marked on the fan and motor pulleys, or estimate the pitch diameters by us- ing the pulley outside diameters. Then:

Example: Actual Approximate

Nameplate Motor Rpm = 1760 1760

Mtr Sheave Pitch Diameter = 8.9 in. 9.0 (OD)

Fan Sheave Pitch Diameter = 12.4 in. 12.5 (OD)

Fan Rpm = 1760 x 8.9 1760 x 9 = 12.4 12.5 = 1263 Rpm 1267 Rpm

Refer to Table 1, Physical Data for maximum allowable fan speeds for standard wheels. Excessive fan speed may result in condensate carryover from cooling coil or fan motor over- load and wheel failure.

7. Check direction of rotation (see Fig. 45). Arrow on drive side of fan housing indicates correct direction of rotation.

8. Check vibration. If excessive vibration occurs, check for the following: a. Variable sheave (if air balance of system has been

accomplished: replace sheave with fixed sheave for continuous application).

b. Drive misalignment. c. Mismatched, worn or loose belts. d. Wheel or sheaves loose on shaft. e. Loose bearings. f. Loose mounting bolts. g. Motor out of balance. h. Sheaves eccentric or out of balance. i. Vibration isolators improperly adjusted. j. Out-of-balance or corroded wheel (rebalance or

replace if necessary). k. Accumulation of material on wheel (remove excess

material). COILS Chilled Water Coil Typical coil vents, drains, and lifting points are shown in Fig. 25.

DX Coil Charge refrigerant. Also refer to condensing unit ser- vice and installation instructions. Refrigerant operating charge for unit coil is shown in Table 2.

SERVICE

General 1. Place a suitable walkway to protect floor insulation whenev-

er entering the fan section. 2. Review Safety Considerations at beginning of these instruc-

tions. Good safety habits are important tools when perform- ing service procedures.

3. To make speed measurements, use a strobe-style tachometer or calculate per Step 6 of Start-Up, Check List on page 35.

Fan Motor Replacement 1. Shut off motor power. 2. Disconnect and tag power wires at motor terminals. 3. Loosen motor brace-to-mounting-rail attaching bolts. Loos-

en belt tensioning bolts to adjust the motor position so V- belts can be removed without stretching over grooves.

4. Mark belt as to position. Remove and set aside belts. 5. Remove motor to motor bracket holddown bolts. 6. Remove motor pulley and set aside. 7. Remove motor. 8. Install new motor. Reassemble by reversing Steps 1-6. Be

sure to reinstall multiple belts in their original position. Use a complete new set if required. Do not stretch belts over sheaves. Review the sections on motor and sheave installa- tion, sheave alignment and belt tensioning discussed previ- ously (Fig. 21-23).

9. Reconnect motor leads and restore power. Check fan for proper rotation as described in Start-Up, Check List on page 35.

Coil Cleaning DETERGENT Spray mild detergent solution on coils with garden-type sprayer. Rinse with fresh water. Check to ensure con- densate line is free. Excess water from cleaning may flood unit if condensate line is plugged. STEAM Remove coil to facilitate cleaning and prevent dam- age to unit insulation. See Coil Removal section on page 37.

Winter Shutdown (Chilled Water Coil Only) It is recommended that auxiliary drain piping be added to coil piping if yearly winterizing of coils is anticipated. This auxiliary piping should be located at the highest and lowest point on the respective header connection for each coil. ANTIFREEZE METHODS OF COIL PROTECTION 1. Close coil water supply and return valves. 2. Drain coil as follows:

Method I Break flange of coupling at each header loca- tion. Separate flange or coupling connection to facilitate coil draining. Method II Open both valves to auxiliary drain piping.

3. After coil is drained, Method I, connect line with a service valve and union from upper nozzle to an antifreeze reservoir. Connect a self-priming reversible pump between the low header connection and the reservoir. Method II, make con- nection to auxiliary drain valves.

4. Fill reservoir with any inhibited antifreeze acceptable to code and underwriter authority.

5. Open service valve and circulate solution for 15 minutes; then check its strength.

Fan Rpm =

Motor Rpm x Motor Sheave Pitch Diameter (in.)

Fan Sheave Pitch Diameter (in.)

Fig. 45 Fan Wheel Rotation

37

6. If solution is too weak, add more antifreeze until desired strength is reached, then circulate solution through coil for 15 minutes or until concentration is satisfactory.

7. Remove upper line from reservoir to reversible pump. Drain coil to reservoir and then close service valve.

8. Break union and remove reservoir and its lines. 9. Leave coil flanges or coupling open and auxiliary drain

valves open until spring. AIR DRYING METHOD OF COIL PROTECTION (Unit and coil must be level for this method.) 1. Close coil water supply and return main valves. 2. Drain coil as described in procedures for Antifreeze Methods

of Coil Protection. 3. Connect air supply or air blower to inlet header connection

and close its drain connection. 4. Circulate air and check for air dryness by holding mirror in

front of open vent in outlet header drain connection. Mirror will fog if water is still present.

5. Allow coil to stand for a few minutes; repeat step 4 until coil is dry.

Field-Installed Coils (39LA,LD Only) When a 39LA or 39LD unit is ordered without the coil, the following loose parts are shipped (see Fig. 46): bottom coil baffle side hairpin baffle side header baffle top coil baffle

These parts should be field-installed onto the coil before plac- ing the coil into the unit. Once the baffles are installed, install the

coil with the downstream bottom of the coil attached to the upright mounting flange as shown in Fig. 45. Adjust the coil and then at- tach the top coil baffle to the top flange provided.

Coil Removal HORIZONTAL UNIT SLANT COIL REMOVAL (39LA Units) NOTE: Item numbers are in Fig. 47. 1. Refer to Fig. 10 for service area clearance. 2. Disconnect piping (Item 5). 3. On top panel (Item 3), remove screws located directly above

side panels (Items 2 and 6). Top panels may be removed from unit to provide more workspace, but it is not required.

4. Remove right side panels (Item 6). 5. If accessory is present, remove accessory side panel (Item 1)

on left side of unit. Detach filter track support bracket if up- stream accessory is a filter.

6. Remove screws from inside baffle (Item 13). Leave baffle at- tached to left side panel (Item 2).

7. Remove left side panel (Item 2). 8. Remove condensate baffle (Item 8). 9. Remove coil holddown screws (Items 9 and 11).

10. Remove baffle screws (Item 4) from downstream side of coil.

11. Tilt coil (Item 10) away from coil support panels (Items 7 and 12) and slowly slide coil out of unit.

12. Replace coil by reversing preceding Steps 1-11.

38

BOTTOM COIL BAFFLE

SEE TOP FLANGE DETAIL

BOTTOM MOUNTING FLANGE

TOP FLANGE DETAIL

TOP COIL BAFFLE

SIDE HEADER BAFLE

SIDE HAIRPIN BAFFLE

Fig. 46 Field-Installed Coils (39LA and LD only)

LEGEND

Fig. 47 Horizontal Unit Slant Coil Removal (39LA Units Sizes 03-21)

1 Accessory Side Panel 8 Condensate Baffle 2 Left Side Panel 9 Holddown Screws 3 Top Panels 10 Coil 4 Baffle Screws 11 Holddown Screws 5 Piping 12 Left Support Panel 6 Right Side Panels 13 Inside Baffle 7 Right Support Panel

39

VERTICAL UNIT SLANT COIL REMOVAL (39LD Units) NOTE: Item numbers are in Fig. 48. 1. Refer to Fig. 10 for service area clearance. 2. Disconnect piping (Item 6). 3. Through fan access door (Item 2), remove screws (Item 3),

while holding angle (Item 4) to top of coil side panels (Item 7). On opposite end of unit, gain access to similar screws by removing side panels (Item 1).

4. Remove right side panels (Item 7). NOTE: Support of fan section may be required after removal of side panels (Items 7 and 16).

5. If accessory is present, remove accessory side panel (Item 15) on left side of unit. Detach filter track support bracket if upstream accessory is a filter.

6. Remove screws from inside baffle (item 14). Leave baffle at- tached to left side panel (Item 16).

7. Remove left side panel (Item 16). NOTE: Support of fan section may be required after removal of side panels (Items 7 and 16).

8. Remove condensate baffle (Item 9). 9. Remove coil holddown screws (Items 10 and 12).

10. Remove baffle screws (Item 5) from downstream side of coil.

11. Tilt coil (Item 11) away from coil support panels (Items 8 and 13).

12. Replace coil by reversing preceding Steps 1 - 11.

LEGEND

Fig. 48 Vertical Unit Slant Coil Removal (39LD Units Sizes 03-21)

1 Fan Side Panel 10 Holddown Screws 2 Fan Access Door 11 Coil 3 Screws 12 Holddown Screws 4 Angle 13 Left Support Panel 5 Baffle Screws 14 Inside Baffle 6 Piping 15 Accessory Side Panel 7 Right Side Panels 16 Left Side Panels 8 Right Support Panel 17 Rear Panel 9 Condensate Baffle

40

HORIZONTAL OR VERTICAL UNIT DUAL COIL REMOVAL (39LA,39LD units size 25) (NOTE: Item numbers are in Fig. 49 unless otherwise indicated.) 1. Refer to Fig. 10 for service area requirements. 2. Disconnect piping (Item 5). 3. Horizontal Unit, 39LA On top panel (Item 3) remove

screws located directly above side panels (Items 2 and 6). Top panels may be removed from unit to provide more workspace, but it is not required. Vertical Unit, 39LD Through fan access door (Item 2, Fig. 41), remove screws (Item 3, Fig. 48) holding angle (Item 4, Fig. 48) to top of coil panels (Item 7, Fig. 48). Remove rear panel (Item 17, Fig. 48) and remove baffle an- gle screws (Item 4) holding top baffle to coil.

4. Remove side panel(s) (Item 6). NOTE: Vertical units may require support of fan section af- ter removal of side panels.

5. If accessory is present, remove accessory side panel (Item 1) on left side of unit. Detach filter track support bracket if up- stream accessory is a filter.

6. Remove screws from horizontal baffle (Item 8). Leave baffle attached to upper condensate pan (Item 9).

7. Remove screws from inside baffles (Item 7). Leave baffles attached to left side panel (Item 2).

8. Slide coils and header and baffles from unit. 9. Replace coils by reversing proceeding Steps 1-8.

LEGEND

Fig. 49 Horizontal or Vertical Unit Dual Coil Removal (39LA,LD Units, Sizes 25)

1 Accessory Side Panel 6 Right Side Panels 2 Left Side Panel 7 Inside Baffle 3 Top Panels 8 Horizontal Baffle 4 Baffle Angle Screws 9 Upper Condensate Pan 5 Piping 10 Baffle Screw

41

HORIZONTAL OR VERTICAL UNIT VERTICAL COIL REMOVAL (39LB,LC,LF,LH Units) Item numbers are in Fig. 50 unless otherwise indicated. 1. Refer to Fig. 10 for service area requirements. 2. Disconnect piping (Item 6). 3. Horizontal Unit, 39LB and 39LC On top panel (Item 4)

remove screws located directly above side panels (Items 2 and 7). Top panels may be removed from unit to provide more workspace, but it is not required. Vertical Unit, 39LF and 39LH Through fan access door (Item 2, Fig. 48), remove screws (Item 3, Fig. 48) holding angle (Item 4, Fig. 46) to top of coil panels (Item 7, Fig. 48). Remove rear panel (Item 17, Fig. 48) and remove baffle an- gle screws (Item 5) holding top baffle to coil.

4. Remove side panel(s) (Item 7). NOTE: Vertical units may require support of fan section af- ter removal of side panels.

5. If accessory is present, remove accessory side panel (Item 1) on left side of unit. Detach filter track support bracket if up- stream accessory is a filter.

6. Remove screws (Item 8) from inside baffle (Item 3). Leave baffle attached to left side panel (Item 2).

7. Slide coil and header end baffle from unit. 8. Replace coil by reversing preceding Steps 1-7.

Changing Coil Hand NOTE: Electric heat coil hand cannot be changed. NOTE: The coil cover panel is not part of the coil. Remove cover panel from end of unit. New holes must be cut in coil cover panel. Original holes must be plugged and insulated. New side panels may be necessary when changing coil hand. NU-FIN COILS The NuFin coil is airflow direction sensitive, especially when used in dehumidifying applications. Hydronic versions are counterflow circuited for full gravity draining when installed level.

Correct installation will result in the typical bottom inlet on leaving air face and top outlet on entering air face of coil, a self- venting design. This will ensure cold air contact with cold water, and warm air with hot water.

Coil repositioning for opposite hand application will compro- mise one or more of these characteristics. However, there will be those situations where this may prove acceptable.

As a general rule, a change from counterflow circuiting to par- allel flow for sensible heating and cooling applications will result in a 5% drop in net capacity per row of coil. In one and two row heating coils, the actual drop may not be measurable, thus of insig- nificant consequence.

LEGEND

Fig. 50 Horizontal or Vertical Unit Vertical Coil Removal (39LB,LC,LF,LH Units)

1 Accessory Side Panel 5 Baffle Angle Screw 2 Left Side Panel 6 Piping 3 Inside Baffles 7 Right Side Panel 4 Top Panels 8 Baffle Screw

42

It is important that the airflow direction of the NuFin coil be adhered to when latent cooling is possible. Significant mois- ture carryover from the face of the dehumidifying coil will result if this rule is violated, even at very low face velocities. The same result is often experienced if after-market fin coat- ings are applied.

If a NuFin hydronic coil is installed with correct airflow, but opposite piping hand, and counterflow is maintained, steps must be taken to ensure that the coil is continuously vented, and that the water velocity is maintained to prevent the coil from air-binding.

Hot or cold areas of the coil face (or otherwise broad tem- perature differences and stratification) are usually indications that one or more circuits are air-locked internally. This can result in coil freeze-up (a condition NOT covered by warranty).

Refrigerant coils may be rotated for opposite hand applica- tions, maintaining the proper airflow direction.

Do not reposition the distributor(s), they will perform equal- ly well in upflow or downflow positions. When soldering expansion valves to up-feed distributors, use the minimum satisfactory amount of solder to prevent damaging the valve or plugging passages. DIRECT EXPANSION COILS Rotate the coil in vertical plane and reinstall. Distributor must be on downstream side of coil. (Refer to Fig. 51). CHILLED WATER AND HOT WATER COILS These coils can be rotated. If coil is rotated in vertical plane and reinstalled with counterflow maintained, supply will be at the top of the coil and return will be at the bottom. Ensure coil is continuously vented and water velocity is maintained to prevent air binding.

STEAM INNER DISTRIBUTING TUBE COILS Rotate in horizontal plane and reinstall. See Fig. 51. PIPING Direct expansion, chilled water, and hot water coils should always be piped for counterflow. (Fluid should enter the coil at the leaving-air side.) Steam coils must have the condensate connection at bottom of coil.

To determine intervals for cleaning coils in contaminated air operations, pressure taps should be installed across the coils and checked periodically. Abnormal air pressure drop will indi- cate a need for cleaning the coils. Annual maintenance should include: 1. Clean the line strainers. 2. Blow down the dirt leg. 3. Clean and check operation of steam traps. 4. Check operation of control valves. 5. Check the operation of check valves to prevent conden-

sate flowback. 6. Check operation of thermostatic air vents, if used. A float

and thermostatic trap will contain a thermostatic air vent. When the bellows is ruptured, it will fail closed.

7. Check operation of vacuum breakers. 8. Check operation of the thermal protection devices used

for freeze-up protection. 9. Steam or condensate should not be allowed to remain in

the coil during the off season.This will prevent the forma- tion and build up of acids.

There are additional precautions and control strategies, as found in various catalogues and in the ASHRAE Fundamentals

Handbook and in the Carrier System Design Guide Piping Section, when the entering-air temperature to the coil falls be- low 35 F. These conditions occur when IDT coils are used for pre-heat and/or face and bypass applications. Freeze up protection: 1. Use a strainer in the supply line and the dirt leg ahead of

the trap.

2. Use a vacuum breaker in the return. 3. Do not use overhead returns from the coil. A floodback

can occur. 4. An immersion thermostat to control outdoor-air dampers

and the fan motor is recommended. This control is acti- vated when the steam supply fails or the condensate temperature drops below a predetermined temperature, usually 120 F.

5. On low pressure and vacuum systems, the immersion thermostat may be replaced by a condensate drain with a thermal element. This element opens and drains the coil when the condensate temperature drops below 165 F. Note the thermal condensate drain is limited to 5 psig pressure. At greater coil pressures they will not open.

In spite of the precautions listed above, a coil may still freeze up. An oversize capacity coil, at partial load, with a modulating steam control valve will occasionally freeze. Freezing occurs in the 20 F to 35 F range of entering-air temperatures. A better installation would be an undersize coil, with an on/off control valve with thermostatic control in the outside air, set at 35 F air temperature, installed downstream of the first coil; or setting the minimum steam pressure at 5 psig.

Filters FILTER SECTIONS See Table 14 for filter data. Filters are field supplied.

Flat filter section can use 2-in. or 4-in. thick filters. The flat filter section as shipped accepts 2-in. filters. Remove spacer in each filter track to provide the 4-in. space required to accom- modate 4-in. filters.

On all filter sections, filters are pushed into the track until they touch the opposite side of the unit. Any remaining space is taken up by the adjustable 2-piece sheet metal spacer. See Fig. 52 for filter arrangements.

CAUTION

Chilled and hot water coils must not be rotated horizon- tally. If coils are rotated horizontally, severe water blow-off will result.

DX AND ALL WATER COILS

STEAM COILS ONLY

Fig. 51 Coil Rotation

43

Fan Shaft Bearing Removal 1. Lock open and tag electrical disconnect. 2. Enter through fan section access door or remove panels as

required. 3. Place plywood or other rigid covering on floor to protect in-

sulation from damage. 4. Block wheel so that it will not pinwheel due to natural draft

through the unit. 5. Loosen motor base to frame bolts. Adjust motor to release

belt tension so removal of belts is done without stretching. Do not stretch belts over sheaves. Damage to belt can result.

6. Remove bolts on bushing of fan shaft sheave, insert bolts in jacking hole provided on bushing and slowly jack bushing from sheave. Then remove bushing on sheave.

7. Loosen bearing setscrews and locking collar. 8. Remove bearing holddown bolts. 9. Remove bearing while observing the following precautions:

a. Make certain fan shaft surface is not rough or scored. If so, clean up surface with fine emery cloth.

b. Add a few drops of oil after cleanup of shaft end.

10. Check fan shaft diameter at bearing mount. If worn by more than .001 in. below nominal, shaft should be replaced.

11. Install new bearing, tighten holddown bolts and then tighten bearing locking collar and setscrews.

12. Make certain fan wheel does not rub sides of fan housing af- ter installing new bearings.

13. Recoat fan shaft with a rust inhibitor or grease. 14. Replace sheave and belts. Adjust and align as described in

Installation sections on installing sheaves and V-belts. 15. Remove insulation protection. 16. Replace access panels. 17. Restore electrical power.

Table 14 Filter Data

CAUTION

It should not be necessary to drive a new bearing onto shaft. If light tapping is needed, do not tap against outer race.

39L UNIT SIZE 03 06 08 10 12 15 18 21 25 Angle Filter Section

Filter QtySize (in.) 216x25 416x20 216x20 216x25 416x25 616x20 916x20 1216x20 416x20

816x25 416x20 816x25

Nominal Face Area (sq ft) 5.56 8.89 10.00 11.11 13.33 20.00 26.67 31.11 31.11 Filter Mixing Box Section

Filter QtySize (in.) 216x25 416x20 216x20 216x25 416x25 616x20 916x20 916x20 316x20

616x25 416x20 816x25

Nominal Face Area (sq ft) 5.56 8.89 10.00 11.11 13.33 20.00 20.00 23.33 31.11 Flat Filter Section

Filter QtySize (in.) 216x16 220x20 220x25 216x25 120x25 320x25 616x20 316x20

320x20 320x25 316x25

216x20 220x20 220x25 216x25

Nominal Face Area (sq ft) 3.56 5.56 6.94 9.03 10.42 13.33 15.00 18.75 22.50

44

16

20

25

16

20

25 25 25

16 20 20

SIZE 21

SIZE 25

Fig. 52 Filter Arrangement, 2-in. and 4-in. Flat

45

Fan and Shaft Removal (Fig. 53) The fan wheel and shaft may be removed through inlet side of fan housing. 1. Remove drive belts as described in Fan Shaft Bearing Re-

moval on page 43. 2. Block up fan wheel within housing to prevent dropping

when bearing bolts are removed. 3. Loosen and remove bearing holddown bolts. 4. Remove bearing support channels and inlet ring from one

side. 5. Remove fan shaft and fan wheel from unit. 6. Remove fan shaft from fan wheel. 7. Replace shaft and wheel into fan in the reverse order of their

removal. 8. Inspect bearings and if serviceable, replace on shaft. 9. Align fan wheel and shaft assembly in fan scroll. Check cut-

off location if wheel failure damaged cutoff plate. See Fig. 54.

10. Tighten bearing holddown bolts, bearing setscrews and shaft setscrews.

11. Field balancing of shaft and wheel is recommended.

Lubrication MOTORS Lubricate in accordance with nameplate attached to motor or with manufacturers recommendations included with motor. BEARINGS Fan Bearings Lubricate fan bearings every 3 months with suitable bearing grease. Typical lubricants are given in Table 15. Inlet Vane and Outlet Damper Bearings These bearings are oil-impregnated. Annually lubricate with a few drops of nondeter- gent SAE (Society of Automotive Engineers) 20 oil.

Table 15 Lubricant Data

*Preferred lubricant because it contains rust and oxidation inhibi- tors.

IMPORTANT: Replacement shafts must have a diam- eter tolerance at bearing mount of nominal. Carrier-specified parts are recommended.

MANUFACTURER LUBRICANT Sunoco Prestige 42 Texaco Multipak 2 Texaco Regal AFB-2* Mobil Mobilplex EP No. 1

+ .0000 .001 Fig. 53 Fan Shaft and Bearing Removal

Fig. 54 Fan Cutoff Plate Data (in.)

39L UNIT SIZE CUTOFF A

CUTOFF CLEARANCE B

03 65/8 7/8 06 8 1 08 103/8 11/2 10 93/4 13/8 12 93/4 13/8 15 12 15/8 18 153/4 2 21 153/4 2 25 201/2 211/16

46

Fan Sled Disassembly in some cases on vertical units (39LD, 39 LF, or 39LH), it may be necessary to remove the fan sled (Fig. 55) from the unit and break it down into smaller components.

To remove the fan sled: 1. Disconnect the fan discharge by removing the screws from

the discharge of the fan housing. Remove the fan discharge panel (Fig. 56).

2. Remove all of the panels from the fan section (Fig. 57). 3. Remove the fan by removing the 4 screws on the corner of

the fan sled. On larger units the fan sled may be extremely heavy. Affix appropriate rigging to remove the required components, noting on a diagram where each component is attached. See Fig. 58.

NOTE: Reinstall the components in reverse order.

9-4 56

Fig. 55 Fan Sled

a3 4

Fig. 56 Remove Fan Discharge Panel

a39-4457

Fig. 57 Remove All Panels

a39-4458

Fig. 58 Remove Fan

a39-4459

47

METRIC CONVERSION CHART

Manufacturer reserves the right to discontinue, or change at any time, specifications or designs without notice and without incurring obligations. Catalog No. 533-080 Printed in U.S.A. Form 39-7SI Rev. A Pg 48 12-2020 Replaces: New <

Manualsnet FAQs

If you want to find out how the 39LA Carrier works, you can view and download the Carrier 39LA Installation Instructions on the Manualsnet website.

Yes, we have the Installation Start Up And Service Instructions for Carrier 39LA as well as other Carrier manuals. All you need to do is to use our search bar and find the user manual that you are looking for.

The Installation Start Up And Service Instructions should include all the details that are needed to use a Carrier 39LA. Full manuals and user guide PDFs can be downloaded from Manualsnet.com.

The best way to navigate the Carrier 39LA Installation Instructions is by checking the Table of Contents at the top of the page where available. This allows you to navigate a manual by jumping to the section you are looking for.

This Carrier 39LA Installation Instructions consists of sections like Table of Contents, to name a few. For easier navigation, use the Table of Contents in the upper left corner.

You can download Carrier 39LA Installation Instructions free of charge simply by clicking the “download” button in the upper right corner of any manuals page. This feature allows you to download any manual in a couple of seconds and is generally in PDF format. You can also save a manual for later by adding it to your saved documents in the user profile.

To be able to print Carrier 39LA Installation Instructions, simply download the document to your computer. Once downloaded, open the PDF file and print the Carrier 39LA Installation Instructions as you would any other document. This can usually be achieved by clicking on “File” and then “Print” from the menu bar.